INVENTORY MANAGEMENT AND MATERIAL REQUIREMENT PLANNING TO REDUCE LOGISTIC COST AND LEADTIME FOR SHUTDOWN AND TURNAROUND ACTIVITIES AT PT MULTI STEAM POWER
PT Multi Steam Power (MSP) operates the South Davis Cogeneration Plant in Sumatra. This company supplies electricity and steam to PT California Petroleum Energy (CPE) which operates Raja Block. The plant has a total of 300 MW capacity from three combustion turbines operated along with three heat...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/75047 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | PT Multi Steam Power (MSP) operates the South Davis Cogeneration Plant in Sumatra. This company
supplies electricity and steam to PT California Petroleum Energy (CPE) which operates Raja Block.
The plant has a total of 300 MW capacity from three combustion turbines operated along with three heat
recovery steam generators with a combined steam generating capacity of over 360,000 barrels of coldwater
equivalent
per
day
to
support
Enhanced
Oil
Recovery
(EOR)
activities
at
the
Davis
Heavy
Oil
Field.
In
2018,
PT
MSP
had
to
re-evaluate
the
major
parts
planning
as
impacted
of
PT
CPE’s
concession
contract
that
would
end
by
2021.
Engineering
assessment
was
then
conducted
to
identify
and
promote
alternative
uses
of
the
major
parts
that
resulted
OEM
lifetime
extension
recommendation
and
to
optimize
to
utilize
the
used
major
parts
stored
in
the
PT MSP’s
Warehouse.
There are 3 alternatives, including major part planning according to the BP 2018, scenario of used major
parts will be repaired partially after 2021 and scenario of used major parts will be repaired in 20182020.
The costs associated with electricity and steam generation can be classified into three broad
groups: materials (including major parts), labor and overheads. In this case study, the assumption that
labor, overheads cost, and service revenue is the same value for each alternative. Inventory Management
and Material Requirement Planning help management to choose the best scenario and prepare its
budgets. The scenario of used major parts will be repaired partially after 2021 has been selected as the
most attractive option to keep the business continue with high reliability, as the lowest cost of material
expenditure, secure the SDTA optimum material requirement before contract expiration and beyond.
Effective inventory management is crucial for PT MSP to optimize costs and improve overall efficiency.
The company has successfully reduced capital expenditure on major parts by $12.4 million from 2018
to 2021, surpassing the projected Business Plan and outperforming Scenario 1 by $1 million. These cost
reductions are expected to continue, with PT MSP anticipating a cumulative cost reduction of $24.3
million by 2024. By implementing appropriate inventory control strategies, PT MSP can optimize
capital utilization and minimize unnecessary expenses. This will not only improve operational efficiency
but also strengthen the company's financial position, providing a solid foundation for future growth and
sustainability. |
---|