STUDY ESTIMATION OF ECONOMIC LOSS CAUSED BY FLOOD AT GORONTALO CITY BONE RIVER BASIN

Gorontalo City grew into a provincial capital in urban areas causing its own problems. This is in line with the increase in population. The population over the last 5 years shows an upward growth trend. This has an impact on increasing the need for land which has an impact on environmental degradati...

Full description

Saved in:
Bibliographic Details
Main Author: Wicaksono Sasongko, Andhika
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/75109
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:75109
spelling id-itb.:751092023-07-25T10:47:27ZSTUDY ESTIMATION OF ECONOMIC LOSS CAUSED BY FLOOD AT GORONTALO CITY BONE RIVER BASIN Wicaksono Sasongko, Andhika Indonesia Theses flood, loss, economy, HEC-RAS INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/75109 Gorontalo City grew into a provincial capital in urban areas causing its own problems. This is in line with the increase in population. The population over the last 5 years shows an upward growth trend. This has an impact on increasing the need for land which has an impact on environmental degradation which eventually causes natural disasters such as floods. The flood occurred due to the high intensity of rain for 11 hours and inundated 2,204 families and 2,174 houses in Gorontalo City. The absence of a study on economic losses due to flooding in an area is the key to the basic problem in this study. Therefore, this study will discuss the analysis of economic losses due to flooding in Gorontalo City due to the overflow of the bone river. To analyze economic losses, it is necessary to analyze the distribution of flood inundation with 2-Dimensional HEC-RAS software. Economic analysis was conducted using the Economic Commission for Latin America and the Caribbean (ECLAC) method. Based on the results of economic analysis, it is also obtained that the estimated loss for the city spatial planning of Gorontalo in 2039 condition is for the 2-year return period is 211.2 billion Rupiah, for the 10-year return period is 378.64 billion Rupiah, for the 25-year return period is 481.13 billion Rupiah, for the 50-year return period is 562.71 billion Rupiah, for the 100-year return period is 636.26 billion Rupiah and for the 1000-year return period is 1377.18 billion Rupiah. Based on this, the design flood discharge is optimal in the 50-year return period. The optimum value is taken from the trend of increasing loss values which have a greater gradient in the 2-50 year return period compared to the 50-1000 year repeat period. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Gorontalo City grew into a provincial capital in urban areas causing its own problems. This is in line with the increase in population. The population over the last 5 years shows an upward growth trend. This has an impact on increasing the need for land which has an impact on environmental degradation which eventually causes natural disasters such as floods. The flood occurred due to the high intensity of rain for 11 hours and inundated 2,204 families and 2,174 houses in Gorontalo City. The absence of a study on economic losses due to flooding in an area is the key to the basic problem in this study. Therefore, this study will discuss the analysis of economic losses due to flooding in Gorontalo City due to the overflow of the bone river. To analyze economic losses, it is necessary to analyze the distribution of flood inundation with 2-Dimensional HEC-RAS software. Economic analysis was conducted using the Economic Commission for Latin America and the Caribbean (ECLAC) method. Based on the results of economic analysis, it is also obtained that the estimated loss for the city spatial planning of Gorontalo in 2039 condition is for the 2-year return period is 211.2 billion Rupiah, for the 10-year return period is 378.64 billion Rupiah, for the 25-year return period is 481.13 billion Rupiah, for the 50-year return period is 562.71 billion Rupiah, for the 100-year return period is 636.26 billion Rupiah and for the 1000-year return period is 1377.18 billion Rupiah. Based on this, the design flood discharge is optimal in the 50-year return period. The optimum value is taken from the trend of increasing loss values which have a greater gradient in the 2-50 year return period compared to the 50-1000 year repeat period.
format Theses
author Wicaksono Sasongko, Andhika
spellingShingle Wicaksono Sasongko, Andhika
STUDY ESTIMATION OF ECONOMIC LOSS CAUSED BY FLOOD AT GORONTALO CITY BONE RIVER BASIN
author_facet Wicaksono Sasongko, Andhika
author_sort Wicaksono Sasongko, Andhika
title STUDY ESTIMATION OF ECONOMIC LOSS CAUSED BY FLOOD AT GORONTALO CITY BONE RIVER BASIN
title_short STUDY ESTIMATION OF ECONOMIC LOSS CAUSED BY FLOOD AT GORONTALO CITY BONE RIVER BASIN
title_full STUDY ESTIMATION OF ECONOMIC LOSS CAUSED BY FLOOD AT GORONTALO CITY BONE RIVER BASIN
title_fullStr STUDY ESTIMATION OF ECONOMIC LOSS CAUSED BY FLOOD AT GORONTALO CITY BONE RIVER BASIN
title_full_unstemmed STUDY ESTIMATION OF ECONOMIC LOSS CAUSED BY FLOOD AT GORONTALO CITY BONE RIVER BASIN
title_sort study estimation of economic loss caused by flood at gorontalo city bone river basin
url https://digilib.itb.ac.id/gdl/view/75109
_version_ 1822994153257041920