IDENTIFICATION AND QUALITATIVE ANALYSIS OF RISKS TO PROJECT DELAYS DUE TO SUPPLY CHAIN IN TOLL ROAD CONSTRUCTION PROJECTS IN INDONESIA
-
Saved in:
Main Author: | Angelica Pascah S, Putri |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/75239 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
Similar Items
-
SUPPLY CHAIN MANAGEMENT MODELS DEVELOPMENT BY CONSTRUCTION OWNERS OF TOLL ROAD PROJECT IN INDONESIA
by: SULISTYANINGSIH (NIM : 25008308); Pembimbing : Ir. Reini D. Wirahadikusumah, MSCE., Ph.D,, DEWI -
STUDY OF LEAN CONCEPT APPLICATION IN PRIVATE OWNER INTERVENTION AT TOLL ROAD SUPPLY CHAIN PROJECT
by: ANDRIYANI (NIM : 25008005); Pembimbing : Ir. Reini D. Wirahadikusumah, MSCE, Ph.D; Dr. Ir. , SHITA -
IDENTIFICATION AND ANALYSIS OF RISK FACTORS IN BOT TOLL ROAD PROJECTS : AN INDONESIAN STUDY
by: (NIM : 250 07 018); Dosen Pembimbing : Dr. Ir. Puti Farida Marzuki, AKHIRINI -
SUPPLY CHAIN RISK MANAGEMENT FOR CONSTRUCTION PROJECT (CASE STUDY: WASKITA RAJAWALI TOWER PROJECT)
by: ANINTYA NIM 14414050, FARADISA -
IMPLEMENTATION OF RISK MANAGEMENT IN TOLL ROAD PROJECT (CASE STUDY IN TRANS SUMATERA TOLL ROAD JAMBI - RENGAT SEGMENT)
by: Koentjoro