THERMODYNAMIC ANALYSIS ON KALINA CYCLE MODIFICATION TO INCREASE CYCLE EFFICIENCY AND POWER PRODUCTION OF LOW-ENTHALPY GEOTHERMAL POWER PLANT

Electricity is one of the most important aspects in a society. The demand of electricity in Indonesia has been increasing over the years. Indonesia has already had geothermal power plants which are located in 17 geothermal working areas. The total geothermal power plant capacity in Indonesia is 2.28...

Full description

Saved in:
Bibliographic Details
Main Author: Muhammad Prakasa, Farhan
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/75241
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia