THERMODYNAMIC ANALYSIS ON KALINA CYCLE MODIFICATION TO INCREASE CYCLE EFFICIENCY AND POWER PRODUCTION OF LOW-ENTHALPY GEOTHERMAL POWER PLANT
Electricity is one of the most important aspects in a society. The demand of electricity in Indonesia has been increasing over the years. Indonesia has already had geothermal power plants which are located in 17 geothermal working areas. The total geothermal power plant capacity in Indonesia is 2.28...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/75241 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |