ANALYSIS PRODUCTION PROCESS CONTROL USING RISK ANALYSIS, TOTAL PRODUCTIVE MAINTENANCE AND STATISTICAL PROCESS CONTROL AT PT. LRI

The production process is an important element that must be controlled in the pharmaceutical industry. One of the control parameters is the absence of waste that occurs on the production floor. Waste has a direct impact on an increase in direct labor and factory overhead so that it has implica...

Full description

Saved in:
Bibliographic Details
Main Author: Ramadhan, Ghiyats
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/75690
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:75690
spelling id-itb.:756902023-08-07T08:39:19ZANALYSIS PRODUCTION PROCESS CONTROL USING RISK ANALYSIS, TOTAL PRODUCTIVE MAINTENANCE AND STATISTICAL PROCESS CONTROL AT PT. LRI Ramadhan, Ghiyats Indonesia Theses reject printing, reject weight, risk analysis, total productive maintenance, statistical process control INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/75690 The production process is an important element that must be controlled in the pharmaceutical industry. One of the control parameters is the absence of waste that occurs on the production floor. Waste has a direct impact on an increase in direct labor and factory overhead so that it has implications for an increase in the Cost of Good Solds (COGS). This study aims to analyze the control of the production process at the bulk filling stage and the primary packaging printing process by looking at the rate of reject of the two processes based on a combination risk assessment of Ishikawa diagrams-FMEA and with improvement methods using Total Productive Maintenance (TPM) and Statistical Process Control ( SPC). The study was conducted on a total of 60 batch records by analyzing 30 batch records before repair and 30 batch records after repair. The results of improvements with risk analysis and the application of TPM have an impact on reducing the proportion of weighted centerline rejects on the Laney p-chart control chart where the centerline has been reduced from 0.36% to 0.035%. The proportion of centerline reject printing on the Laney p-chart control chart was also reduced from 1.56% to 0.58%. The two repair results are in accordance with the company's internal weight acceptance reject criteria of no more than 0.25% and reject printing of no more than 1%. The repair process was confirmed by the Mann-Whitney test, the repair results showed a P-value <0.05 so it was stated that the process improvements made had a significant impact. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The production process is an important element that must be controlled in the pharmaceutical industry. One of the control parameters is the absence of waste that occurs on the production floor. Waste has a direct impact on an increase in direct labor and factory overhead so that it has implications for an increase in the Cost of Good Solds (COGS). This study aims to analyze the control of the production process at the bulk filling stage and the primary packaging printing process by looking at the rate of reject of the two processes based on a combination risk assessment of Ishikawa diagrams-FMEA and with improvement methods using Total Productive Maintenance (TPM) and Statistical Process Control ( SPC). The study was conducted on a total of 60 batch records by analyzing 30 batch records before repair and 30 batch records after repair. The results of improvements with risk analysis and the application of TPM have an impact on reducing the proportion of weighted centerline rejects on the Laney p-chart control chart where the centerline has been reduced from 0.36% to 0.035%. The proportion of centerline reject printing on the Laney p-chart control chart was also reduced from 1.56% to 0.58%. The two repair results are in accordance with the company's internal weight acceptance reject criteria of no more than 0.25% and reject printing of no more than 1%. The repair process was confirmed by the Mann-Whitney test, the repair results showed a P-value <0.05 so it was stated that the process improvements made had a significant impact.
format Theses
author Ramadhan, Ghiyats
spellingShingle Ramadhan, Ghiyats
ANALYSIS PRODUCTION PROCESS CONTROL USING RISK ANALYSIS, TOTAL PRODUCTIVE MAINTENANCE AND STATISTICAL PROCESS CONTROL AT PT. LRI
author_facet Ramadhan, Ghiyats
author_sort Ramadhan, Ghiyats
title ANALYSIS PRODUCTION PROCESS CONTROL USING RISK ANALYSIS, TOTAL PRODUCTIVE MAINTENANCE AND STATISTICAL PROCESS CONTROL AT PT. LRI
title_short ANALYSIS PRODUCTION PROCESS CONTROL USING RISK ANALYSIS, TOTAL PRODUCTIVE MAINTENANCE AND STATISTICAL PROCESS CONTROL AT PT. LRI
title_full ANALYSIS PRODUCTION PROCESS CONTROL USING RISK ANALYSIS, TOTAL PRODUCTIVE MAINTENANCE AND STATISTICAL PROCESS CONTROL AT PT. LRI
title_fullStr ANALYSIS PRODUCTION PROCESS CONTROL USING RISK ANALYSIS, TOTAL PRODUCTIVE MAINTENANCE AND STATISTICAL PROCESS CONTROL AT PT. LRI
title_full_unstemmed ANALYSIS PRODUCTION PROCESS CONTROL USING RISK ANALYSIS, TOTAL PRODUCTIVE MAINTENANCE AND STATISTICAL PROCESS CONTROL AT PT. LRI
title_sort analysis production process control using risk analysis, total productive maintenance and statistical process control at pt. lri
url https://digilib.itb.ac.id/gdl/view/75690
_version_ 1822007758501707776