PLANNING OF GUMANTI MINI HYDRO POWER PLANT (MHPP), SOLOK REGENCY, WEST SUMATERA

The Gumanti Mini Hydro Power Plant (PLTM) utilizes the flow of the Batang Gumanti River with a watershed area of 176,94 km2, with the aim of increasing the ratio of Renewable Energy (EBT) usage in West Sumatra and Indonesia. In planning the Gumanti PLTM, rainfall data from the Danau Diatas Station...

Full description

Saved in:
Bibliographic Details
Main Author: Prahasta, Deustin
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/75727
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia