LEGACY FACILITY: DECISION MAKING ANALYSIS CASE STUDY OF PT BIO FARMA

Biofarma has facing the issue of legacy facility that become findings in routine inspection of NRA. The issue can be escalated to shutdown the production facility due to legacy facility hardly comply with cGMP. The study is for choose the best alternatives of build new facility, renovating current f...

Full description

Saved in:
Bibliographic Details
Main Author: Satrio Wicaksono, Muhammad
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/75751
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:75751
spelling id-itb.:757512023-08-07T14:22:08ZLEGACY FACILITY: DECISION MAKING ANALYSIS CASE STUDY OF PT BIO FARMA Satrio Wicaksono, Muhammad Manajemen umum Indonesia Theses Legacy Facility, cGMP, MCDM, AHP. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/75751 Biofarma has facing the issue of legacy facility that become findings in routine inspection of NRA. The issue can be escalated to shutdown the production facility due to legacy facility hardly comply with cGMP. The study is for choose the best alternatives of build new facility, renovating current facility and toll manufacturing with consideration of financial, regulation compliance, project completion speed and strategy risk. The study is using Analytic Hierarchy Process (AHP) to get a decision from the experts in biofarma. the respondents are 7 people with many expertise including finance, project management, GMP, Operations, Demand Forecasting, Tech. Transfer, Business Development, cGMP engineering and the management representative. To get conclusion of group decision making, the results of each respondent is being aggregated with geometric mean. The compliance with regulation (0.356) become the top priority, followed by strategy risk (0.295), project completion speed (0.250) and financial aspect (0.098). The findings is build new facility (0.4563) is become the best alternative among the other alternatives followed by toll manufacturing (0.3251) and renovating current facility (0.2186). The finding is build new facility is become the best alternative among the other alternatives (0.4563) followed by toll manufacturing (0.3251) and renovating current facility (0.2186) with considering of criteria financial aspect, regulation aspect, project completion speed aspect and strategy risk aspect. The recommendation is for build new facility the project plan should be implemented. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Satrio Wicaksono, Muhammad
LEGACY FACILITY: DECISION MAKING ANALYSIS CASE STUDY OF PT BIO FARMA
description Biofarma has facing the issue of legacy facility that become findings in routine inspection of NRA. The issue can be escalated to shutdown the production facility due to legacy facility hardly comply with cGMP. The study is for choose the best alternatives of build new facility, renovating current facility and toll manufacturing with consideration of financial, regulation compliance, project completion speed and strategy risk. The study is using Analytic Hierarchy Process (AHP) to get a decision from the experts in biofarma. the respondents are 7 people with many expertise including finance, project management, GMP, Operations, Demand Forecasting, Tech. Transfer, Business Development, cGMP engineering and the management representative. To get conclusion of group decision making, the results of each respondent is being aggregated with geometric mean. The compliance with regulation (0.356) become the top priority, followed by strategy risk (0.295), project completion speed (0.250) and financial aspect (0.098). The findings is build new facility (0.4563) is become the best alternative among the other alternatives followed by toll manufacturing (0.3251) and renovating current facility (0.2186). The finding is build new facility is become the best alternative among the other alternatives (0.4563) followed by toll manufacturing (0.3251) and renovating current facility (0.2186) with considering of criteria financial aspect, regulation aspect, project completion speed aspect and strategy risk aspect. The recommendation is for build new facility the project plan should be implemented.
format Theses
author Satrio Wicaksono, Muhammad
author_facet Satrio Wicaksono, Muhammad
author_sort Satrio Wicaksono, Muhammad
title LEGACY FACILITY: DECISION MAKING ANALYSIS CASE STUDY OF PT BIO FARMA
title_short LEGACY FACILITY: DECISION MAKING ANALYSIS CASE STUDY OF PT BIO FARMA
title_full LEGACY FACILITY: DECISION MAKING ANALYSIS CASE STUDY OF PT BIO FARMA
title_fullStr LEGACY FACILITY: DECISION MAKING ANALYSIS CASE STUDY OF PT BIO FARMA
title_full_unstemmed LEGACY FACILITY: DECISION MAKING ANALYSIS CASE STUDY OF PT BIO FARMA
title_sort legacy facility: decision making analysis case study of pt bio farma
url https://digilib.itb.ac.id/gdl/view/75751
_version_ 1822007778127904768