CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA
<p align="justify">Center and Weaving Workshop in West Java project functions as a center for production activities and training for traditional West Javanese weaving. This project consists of three buildings that are used for weaving craft facilities, namely the Exhibition-Commercia...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/75823 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:75823 |
---|---|
spelling |
id-itb.:758232023-08-08T09:21:10ZCONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA Qisthiya, 'Iffah Indonesia Final Project Center and Weaving Workshop, construction methods, project scheduling, construction costs estimation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/75823 <p align="justify">Center and Weaving Workshop in West Java project functions as a center for production activities and training for traditional West Javanese weaving. This project consists of three buildings that are used for weaving craft facilities, namely the Exhibition-Commercial Building, the Workshop Building, and the Supporting Building. Effective and efficient construction management is needed to realize the construction planning of the Sentra dan Lokakarya Tenun Building. In this final project, construction management will be discussed which consists of the planning of construction methods, quantification of work volume, construction safety and construction plans, calculation of work productivity, scheduling planning, budget planning, and construction cost estimates. The construction method includes preparatory work, soil, lower structure, and upper structure. This project lasted 213 working days with the direct cost of the West Java Weaving Center and Workshop Project of Rp28,929,476,574.73. Indirect costs amounted to Rp5.330.005.179,64. The total value of the project Implementation Budget Plan is Rp35.051.114.506,04 and the Budget Plan is Rp Rp41.399.741.376,79. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
<p align="justify">Center and Weaving Workshop in West Java project functions as a center for production activities and training for traditional West Javanese weaving. This project consists of three buildings that are used for weaving craft facilities, namely the Exhibition-Commercial Building, the Workshop Building, and the Supporting Building. Effective and efficient construction management is needed to realize the construction planning of the Sentra dan Lokakarya Tenun Building.
In this final project, construction management will be discussed which consists of the planning of construction methods, quantification of work volume, construction safety and construction plans, calculation of work productivity, scheduling planning, budget planning, and construction cost estimates. The construction method includes preparatory work, soil, lower structure, and upper structure. This project lasted 213 working days with the direct cost of the West Java Weaving Center and Workshop Project of Rp28,929,476,574.73. Indirect costs amounted to Rp5.330.005.179,64. The total value of the project Implementation Budget Plan is Rp35.051.114.506,04 and the Budget Plan is Rp Rp41.399.741.376,79.
|
format |
Final Project |
author |
Qisthiya, 'Iffah |
spellingShingle |
Qisthiya, 'Iffah CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA |
author_facet |
Qisthiya, 'Iffah |
author_sort |
Qisthiya, 'Iffah |
title |
CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA |
title_short |
CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA |
title_full |
CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA |
title_fullStr |
CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA |
title_full_unstemmed |
CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA |
title_sort |
construction management planning of center and weaving workshop project in west java |
url |
https://digilib.itb.ac.id/gdl/view/75823 |
_version_ |
1822007802317504512 |