CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA

<p align="justify">Center and Weaving Workshop in West Java project functions as a center for production activities and training for traditional West Javanese weaving. This project consists of three buildings that are used for weaving craft facilities, namely the Exhibition-Commercia...

Full description

Saved in:
Bibliographic Details
Main Author: Qisthiya, 'Iffah
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/75823
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:75823
spelling id-itb.:758232023-08-08T09:21:10ZCONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA Qisthiya, 'Iffah Indonesia Final Project Center and Weaving Workshop, construction methods, project scheduling, construction costs estimation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/75823 <p align="justify">Center and Weaving Workshop in West Java project functions as a center for production activities and training for traditional West Javanese weaving. This project consists of three buildings that are used for weaving craft facilities, namely the Exhibition-Commercial Building, the Workshop Building, and the Supporting Building. Effective and efficient construction management is needed to realize the construction planning of the Sentra dan Lokakarya Tenun Building. In this final project, construction management will be discussed which consists of the planning of construction methods, quantification of work volume, construction safety and construction plans, calculation of work productivity, scheduling planning, budget planning, and construction cost estimates. The construction method includes preparatory work, soil, lower structure, and upper structure. This project lasted 213 working days with the direct cost of the West Java Weaving Center and Workshop Project of Rp28,929,476,574.73. Indirect costs amounted to Rp5.330.005.179,64. The total value of the project Implementation Budget Plan is Rp35.051.114.506,04 and the Budget Plan is Rp Rp41.399.741.376,79. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Center and Weaving Workshop in West Java project functions as a center for production activities and training for traditional West Javanese weaving. This project consists of three buildings that are used for weaving craft facilities, namely the Exhibition-Commercial Building, the Workshop Building, and the Supporting Building. Effective and efficient construction management is needed to realize the construction planning of the Sentra dan Lokakarya Tenun Building. In this final project, construction management will be discussed which consists of the planning of construction methods, quantification of work volume, construction safety and construction plans, calculation of work productivity, scheduling planning, budget planning, and construction cost estimates. The construction method includes preparatory work, soil, lower structure, and upper structure. This project lasted 213 working days with the direct cost of the West Java Weaving Center and Workshop Project of Rp28,929,476,574.73. Indirect costs amounted to Rp5.330.005.179,64. The total value of the project Implementation Budget Plan is Rp35.051.114.506,04 and the Budget Plan is Rp Rp41.399.741.376,79.
format Final Project
author Qisthiya, 'Iffah
spellingShingle Qisthiya, 'Iffah
CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA
author_facet Qisthiya, 'Iffah
author_sort Qisthiya, 'Iffah
title CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA
title_short CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA
title_full CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA
title_fullStr CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA
title_full_unstemmed CONSTRUCTION MANAGEMENT PLANNING OF CENTER AND WEAVING WORKSHOP PROJECT IN WEST JAVA
title_sort construction management planning of center and weaving workshop project in west java
url https://digilib.itb.ac.id/gdl/view/75823
_version_ 1822007802317504512