#TITLE_ALTERNATIVE#
Abstract: <br /> <br /> <br /> <br /> <br /> Pipeline operating in onshore is usually buried underground in order not to disturbed by onshore activity so that operate for pipe can go well. But for inspection sometimes the soil above the pipeline have to be excavate...
Saved in:
Main Author: | Harahap (NIM 121 02 033), Depita |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/7583 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM: 121 02 059), Niko -
#TITLE_ALTERNATIVE#
by: Richmawati ( NIM: 121 02 039), Asni -
#TITLE_ALTERNATIVE#
by: Iman (NIM 121 02 010), Nur -
#TITLE_ALTERNATIVE#
by: (NIM 121 02 015), SyaifulAhsan -
#TITLE_ALTERNATIVE#
by: Casanova (NIM 121 02 012), Berry