DESIGN OF BRIDGE AND ADMINISTRATIVE OFFICE FOR CIPANUNDAAN BRIDGE, CIREBON REGENCY, WEST JAVA
Dam is one of the crucial infrastructures in fulfilling the water needs of the surrounding communities. In its operation, the dam requires several supporting infrastructures to maximize its benefits. Cipanundaan Dam has several supporting infrastructures, including bridges and administrative offices...
Saved in:
Main Author: | David Turedo Sianipar, Anju |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/76156 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PLANNING AND EVALUATION OF SPILLWAY STRUCTURE, CIPANUNDAAN DAM,CIREBON REGENCY, WEST JAVA
by: G. A. B. Adyanda Paramarta, I -
DESIGN-BUILD IMPLEMENTATION STRATEGY IN THE ADMINISTRATION OF INFRASTRUCTURE PROJECT IN WEST JAVA PROVINCE
by: Nur Afni, Fatmawati -
DESIGN OF BORED PILE FOUNDATION AND SLOPE STABILITY OF BALANCED CANTILEVER BRIDGE STUDY CASE: DESIGN ALTERNATIVE FOR MAINROAD GLADAK BRIDGE
by: Zhafran Puturahmadika, Mahdy -
FATIGUE EVALUATION OF STEEL ARCH BRIDGE WITH WEIGH IN MOTION (WIM) LOAD (CASE STUDY KALIKUTO BRIDGE)
by: Priya Sulistya, Baskara -
DEVELOPMENT OF FATIGUE ANALYSIS METHOD FOR LONG-SPAN CABLE-STAYED BRIDGES (CASE STUDY : PULAU BALANG BRIDGE)
by: Ilyas Pratama, Nuriana