PLANNING AND EVALUATION OF SPILLWAY STRUCTURE, CIPANUNDAAN DAM,CIREBON REGENCY, WEST JAVA

The provision of clean water can be improved through the construction of water storage structures such as dams. The Cipanundaan Dam in Cirebon Regency was built to meet the needs of clean water and irrigation for the community. The Dam is planned as an embankment dam with a catchment area of 10.9...

Full description

Saved in:
Bibliographic Details
Main Author: G. A. B. Adyanda Paramarta, I
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/76395
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:76395
spelling id-itb.:763952023-08-15T09:08:49ZPLANNING AND EVALUATION OF SPILLWAY STRUCTURE, CIPANUNDAAN DAM,CIREBON REGENCY, WEST JAVA G. A. B. Adyanda Paramarta, I Indonesia Final Project Cipanundaan Dam, Spillway, Hydrology, Planned Flood Discharge, Stability, Hydraulic Design, Stability. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/76395 The provision of clean water can be improved through the construction of water storage structures such as dams. The Cipanundaan Dam in Cirebon Regency was built to meet the needs of clean water and irrigation for the community. The Dam is planned as an embankment dam with a catchment area of 10.98 km2. Therefore, technical planning in the field of Civil Engineering, especially in the field of Water Resources Engineering, is required. The planning includes hydrological analysis, spillway design, diversion channel design, and spillway stability control. Hydrological analysis is carried out to determine the design flood discharge, which will be used for the hydraulic planning of the spillway and diversion channels. From the hydrological analysis results, the design flood discharge for a 1000-year return period is 188 m3/s, and the Probable Maximum Flood (QPMF) is 484 m3/s. The spillway structure is designed using Ogee Spillway with a width of 17.5 m, while the diversion channel uses a circular conduit with a diameter of 1.8 m to accommodate the flood discharge for a 25-year return period. The stability analysis of the spillway design shows that the structure is stable against sliding and overturning with a minimum safety factor of 1.5. Through this planning, it is expected that the Cipanundaan Dam will help meet the demand for clean water and support irrigation activities for the surrounding communities. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The provision of clean water can be improved through the construction of water storage structures such as dams. The Cipanundaan Dam in Cirebon Regency was built to meet the needs of clean water and irrigation for the community. The Dam is planned as an embankment dam with a catchment area of 10.98 km2. Therefore, technical planning in the field of Civil Engineering, especially in the field of Water Resources Engineering, is required. The planning includes hydrological analysis, spillway design, diversion channel design, and spillway stability control. Hydrological analysis is carried out to determine the design flood discharge, which will be used for the hydraulic planning of the spillway and diversion channels. From the hydrological analysis results, the design flood discharge for a 1000-year return period is 188 m3/s, and the Probable Maximum Flood (QPMF) is 484 m3/s. The spillway structure is designed using Ogee Spillway with a width of 17.5 m, while the diversion channel uses a circular conduit with a diameter of 1.8 m to accommodate the flood discharge for a 25-year return period. The stability analysis of the spillway design shows that the structure is stable against sliding and overturning with a minimum safety factor of 1.5. Through this planning, it is expected that the Cipanundaan Dam will help meet the demand for clean water and support irrigation activities for the surrounding communities.
format Final Project
author G. A. B. Adyanda Paramarta, I
spellingShingle G. A. B. Adyanda Paramarta, I
PLANNING AND EVALUATION OF SPILLWAY STRUCTURE, CIPANUNDAAN DAM,CIREBON REGENCY, WEST JAVA
author_facet G. A. B. Adyanda Paramarta, I
author_sort G. A. B. Adyanda Paramarta, I
title PLANNING AND EVALUATION OF SPILLWAY STRUCTURE, CIPANUNDAAN DAM,CIREBON REGENCY, WEST JAVA
title_short PLANNING AND EVALUATION OF SPILLWAY STRUCTURE, CIPANUNDAAN DAM,CIREBON REGENCY, WEST JAVA
title_full PLANNING AND EVALUATION OF SPILLWAY STRUCTURE, CIPANUNDAAN DAM,CIREBON REGENCY, WEST JAVA
title_fullStr PLANNING AND EVALUATION OF SPILLWAY STRUCTURE, CIPANUNDAAN DAM,CIREBON REGENCY, WEST JAVA
title_full_unstemmed PLANNING AND EVALUATION OF SPILLWAY STRUCTURE, CIPANUNDAAN DAM,CIREBON REGENCY, WEST JAVA
title_sort planning and evaluation of spillway structure, cipanundaan dam,cirebon regency, west java
url https://digilib.itb.ac.id/gdl/view/76395
_version_ 1823653074516836352