ECONOMIC EVALUATION OF PRIMER TIN MINING WITH AND WITHOUT BYPRODUCT UTILIZATION IN ULTIMATE PIT LIMIT SCENARIO AT PT XYZ WITH THE REAL OPTIONS METHOD
Tin mining, followed by the utilization of processing by-products (SHP), requires additional investments, leading to increased capital and operational costs. Therefore, a more comprehensive economic evaluation approach is necessary to assess the feasibility of the business expansion. The conventi...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/77151 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:77151 |
---|---|
spelling |
id-itb.:771512023-08-22T15:52:36ZECONOMIC EVALUATION OF PRIMER TIN MINING WITH AND WITHOUT BYPRODUCT UTILIZATION IN ULTIMATE PIT LIMIT SCENARIO AT PT XYZ WITH THE REAL OPTIONS METHOD Kusuma Wardani, Indah Indonesia Final Project Discounted Cash Flow, Sensitivity Analysis, Real Option Valuation, Binomial Lattice. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/77151 Tin mining, followed by the utilization of processing by-products (SHP), requires additional investments, leading to increased capital and operational costs. Therefore, a more comprehensive economic evaluation approach is necessary to assess the feasibility of the business expansion. The conventional economic evaluation using the Discounted Cash Flow (DCF) method is insufficient to address potential uncertainties that may arise in the future. Thus, the Real Options Binomial Lattice approach is applied to accommodate management flexibility in decisionmaking. The analysis focuses on two UPL scenarios: scenario 1 (LOM 24 years) and scenario 2 (LOM 26 years) with the aim of simulating the best scenario that evaluates the value of both tin and quartz sand. The feasibility analysis using the DCF method shows that all project scenarios, whether mining tin alone or mining tin + SHP, are economically viable. The largest deterministic Net Present Value (NPV) and Internal Rate of Return (IRR) are obtained from scenario 1, which involves mining tin + SHP. Deterministic sensitivity analysis indicates significant changes in the cash flow model due to fluctuations in commodity prices. Without considering historical quartz sand prices in asset value volatility, scenario 1 shows an increase in option premium after utilizing SHP. However, when historical quartz sand prices are included with an assumed price increase of 5-7% per year, scenario 1 exhibits a larger increase in option premium after utilizing SHP compared to not incorporating historical quartz sand prices. This implies that scenario 1 is more advantageous when the company intends to expand its business. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Tin mining, followed by the utilization of processing by-products (SHP), requires
additional investments, leading to increased capital and operational costs.
Therefore, a more comprehensive economic evaluation approach is necessary to
assess the feasibility of the business expansion. The conventional economic
evaluation using the Discounted Cash Flow (DCF) method is insufficient to address
potential uncertainties that may arise in the future. Thus, the Real Options Binomial
Lattice approach is applied to accommodate management flexibility in decisionmaking.
The analysis focuses on two UPL scenarios: scenario 1 (LOM 24 years)
and scenario 2 (LOM 26 years) with the aim of simulating the best scenario that
evaluates the value of both tin and quartz sand. The feasibility analysis using the
DCF method shows that all project scenarios, whether mining tin alone or mining
tin + SHP, are economically viable. The largest deterministic Net Present Value
(NPV) and Internal Rate of Return (IRR) are obtained from scenario 1, which
involves mining tin + SHP. Deterministic sensitivity analysis indicates significant
changes in the cash flow model due to fluctuations in commodity prices. Without
considering historical quartz sand prices in asset value volatility, scenario 1 shows
an increase in option premium after utilizing SHP. However, when historical quartz
sand prices are included with an assumed price increase of 5-7% per year, scenario
1 exhibits a larger increase in option premium after utilizing SHP compared to not
incorporating historical quartz sand prices. This implies that scenario 1 is more
advantageous when the company intends to expand its business. |
format |
Final Project |
author |
Kusuma Wardani, Indah |
spellingShingle |
Kusuma Wardani, Indah ECONOMIC EVALUATION OF PRIMER TIN MINING WITH AND WITHOUT BYPRODUCT UTILIZATION IN ULTIMATE PIT LIMIT SCENARIO AT PT XYZ WITH THE REAL OPTIONS METHOD |
author_facet |
Kusuma Wardani, Indah |
author_sort |
Kusuma Wardani, Indah |
title |
ECONOMIC EVALUATION OF PRIMER TIN MINING WITH AND WITHOUT BYPRODUCT UTILIZATION IN ULTIMATE PIT LIMIT SCENARIO AT PT XYZ WITH THE REAL OPTIONS METHOD |
title_short |
ECONOMIC EVALUATION OF PRIMER TIN MINING WITH AND WITHOUT BYPRODUCT UTILIZATION IN ULTIMATE PIT LIMIT SCENARIO AT PT XYZ WITH THE REAL OPTIONS METHOD |
title_full |
ECONOMIC EVALUATION OF PRIMER TIN MINING WITH AND WITHOUT BYPRODUCT UTILIZATION IN ULTIMATE PIT LIMIT SCENARIO AT PT XYZ WITH THE REAL OPTIONS METHOD |
title_fullStr |
ECONOMIC EVALUATION OF PRIMER TIN MINING WITH AND WITHOUT BYPRODUCT UTILIZATION IN ULTIMATE PIT LIMIT SCENARIO AT PT XYZ WITH THE REAL OPTIONS METHOD |
title_full_unstemmed |
ECONOMIC EVALUATION OF PRIMER TIN MINING WITH AND WITHOUT BYPRODUCT UTILIZATION IN ULTIMATE PIT LIMIT SCENARIO AT PT XYZ WITH THE REAL OPTIONS METHOD |