The MAHAKA Block is operated by PETROYAN which is located in the province East Kalimantan, Indonesia. There are several fields in the MAHAKA block, where the TUNA field is one of them. The TUNA field is located at shallow water (water depth 2-5 m), Within the scope of Field development TUNA Shallow...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/77225 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:77225 |
---|---|
spelling |
id-itb.:772252023-08-23T14:38:59ZSELECTION OF THE SWAMP OR LAND METHOD OPERATION FOR OPENING DEVELOPMENT AREA (CASE STUDY TUNA LOWLAND) Oktavianus Sitinjak, Yan Manajemen umum Indonesia Theses Capital Budgeting Technique, Discounted Cash Flow, Risk Analysis. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/77225 The MAHAKA Block is operated by PETROYAN which is located in the province East Kalimantan, Indonesia. There are several fields in the MAHAKA block, where the TUNA field is one of them. The TUNA field is located at shallow water (water depth 2-5 m), Within the scope of Field development TUNA Shallow Phase 5 is planned to construct 100 additional wells. Out of 100 wells there are 12 wells located in the hinterland (Tuna Lowland) which is land formed from the results of deltaic sedimentation with unstable soil characteristics and has poor carrying capacity. This area would be a good location (Surface location) and currently in the form of nipa palm forests, mangroves, or aquaculture (inland), and different from most other TUNA locations which are swamps (Swamp) so, it has its own challenges in terms of site preparation because it requires large scale work. Because of these conditions, the development of inland areas This can be done through 2 (two) options, namely the swamp operation scheme (Performed with the support of operations and equipment that is already available), or a land operation scheme (carried out like an onshore area operation which has never been implemented in the PETROYAN area). In order to compare the effectiveness of development with swamp operation schemes or land operations from operational and cost aspects, a case study was carried out with the example of the hinterland area 'F adequately represents the actual conditions in the field. This study aims to provide analysis and help choose existing options, then from the existing reserves whether this area is economical enough to be developed. Project valuation is calculated using the Discounted Cash Flow method (DCF) and comply with the provisions of the Production Sharing Contract (PSC) for field operators. Result of this study show that Swamp more advantage than Land method. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Oktavianus Sitinjak, Yan SELECTION OF THE SWAMP OR LAND METHOD OPERATION FOR OPENING DEVELOPMENT AREA (CASE STUDY TUNA LOWLAND) |
description |
The MAHAKA Block is operated by PETROYAN which is located in the province East Kalimantan, Indonesia. There are several fields in the MAHAKA block, where the TUNA field is one of them. The TUNA field is located at shallow water (water depth 2-5 m), Within the scope of Field development TUNA Shallow Phase 5 is planned to construct 100 additional wells. Out of 100 wells there are 12 wells located in the hinterland (Tuna Lowland) which is land formed from the results of deltaic sedimentation with unstable soil characteristics and has poor carrying capacity. This area would be a good location (Surface location) and currently in the form of nipa palm forests, mangroves, or aquaculture (inland), and different from most other TUNA locations which are swamps (Swamp) so, it has its own challenges in terms of site preparation because it requires large scale work. Because of these conditions, the development of inland areas This can be done through 2 (two) options, namely the swamp operation scheme (Performed with the support of operations and equipment that is already available), or a land operation scheme (carried out like an onshore area operation which has never been implemented in the PETROYAN area). In order to compare the effectiveness of development with swamp operation schemes or land operations from operational and cost aspects, a case study was carried out with the example of the hinterland area 'F adequately represents the actual conditions in the field. This study aims to provide analysis and help choose existing options, then from the existing reserves whether this area is economical enough to be developed. Project valuation is calculated using the Discounted Cash Flow method (DCF) and comply with the provisions of the Production Sharing Contract (PSC) for field operators. Result of this study show that Swamp more advantage than Land method. |
format |
Theses |
author |
Oktavianus Sitinjak, Yan |
author_facet |
Oktavianus Sitinjak, Yan |
author_sort |
Oktavianus Sitinjak, Yan |
title |
SELECTION OF THE SWAMP OR LAND METHOD OPERATION FOR OPENING DEVELOPMENT AREA (CASE STUDY TUNA LOWLAND) |
title_short |
SELECTION OF THE SWAMP OR LAND METHOD OPERATION FOR OPENING DEVELOPMENT AREA (CASE STUDY TUNA LOWLAND) |
title_full |
SELECTION OF THE SWAMP OR LAND METHOD OPERATION FOR OPENING DEVELOPMENT AREA (CASE STUDY TUNA LOWLAND) |
title_fullStr |
SELECTION OF THE SWAMP OR LAND METHOD OPERATION FOR OPENING DEVELOPMENT AREA (CASE STUDY TUNA LOWLAND) |
title_full_unstemmed |
SELECTION OF THE SWAMP OR LAND METHOD OPERATION FOR OPENING DEVELOPMENT AREA (CASE STUDY TUNA LOWLAND) |
title_sort |
selection of the swamp or land method operation for opening development area (case study tuna lowland) |
url |
https://digilib.itb.ac.id/gdl/view/77225 |
_version_ |
1822280686409613312 |