#TITLE_ALTERNATIVE#
Runner turbine is one of the important components at Hydro Electric Power Plan (HEPP). The component was made from alloy of Cu-37Zn and always contacts mechanically with water, therefore it was potentially corroded. The quality of the operating water has an important role on corrosion process, parti...
Saved in:
Main Author: | JUNAIDI (NIM 20506007), EKA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/7745 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: Junaidi (NIM 150 03 128) KM. Abuhuroyroh (NIM 150 03 134), Anton -
#TITLE_ALTERNATIVE#
by: DWIBHAKTI (NIM 17403010), EKA -
#TITLE_ALTERNATIVE#
by: SUSILAWATI (NIM 10103039), EKA -
#TITLE_ALTERNATIVE#
by: SETIYA NOVA (NIM 10203044), EKA -
#TITLE_ALTERNATIVE#
by: EKA NUGRAHA (NIM 10503063), FEBRINALDO