USULAN PERBAIKAN PROSES PEMENUHAN SALES ORDER OLEH DEPARTEMEN ENGINEERING PT X MENGGUNAKAN PRODUCT DEVELOPMENT VALUE STREAM MAPPING

PT X is a job shop-based sheet metal fabrication company. In 2022, PT X's monthly on-time delivery targets were not met, prompting management to evaluate the order fulfillment process in each department. Historical data shows that the average overtime hours for the Engineering staff are rela...

Full description

Saved in:
Bibliographic Details
Main Author: Huda Pratama, Aditya
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/77523
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:77523
spelling id-itb.:775232023-09-08T12:56:02ZUSULAN PERBAIKAN PROSES PEMENUHAN SALES ORDER OLEH DEPARTEMEN ENGINEERING PT X MENGGUNAKAN PRODUCT DEVELOPMENT VALUE STREAM MAPPING Huda Pratama, Aditya Indonesia Final Project PD-VSM, Engineering, Multi Moment Analysis. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/77523 PT X is a job shop-based sheet metal fabrication company. In 2022, PT X's monthly on-time delivery targets were not met, prompting management to evaluate the order fulfillment process in each department. Historical data shows that the average overtime hours for the Engineering staff are relatively high compared to the established rules. This indicates that there may be non-value-added activities carried out by the Engineering Department in the order fulfillment process. This study proposes the use of a lean approach based on Product Development Value Stream Mapping (PD-VSM) to streamline the order fulfillment process by the Engineering Department, which shares similarities with product development and production control processes. PD-VSM is combined with Multi-Moment Analysis (MMA) to enhance the value-added aspects of the studied process. MMA is used to complement the limitations of using PD-VSM in a job shop environment. The research stages include process identification and mapping, current value stream mapping, and future value stream mapping. Based on the identification of waste in the current state value stream map, there are 12 priority waste modes in the order fulfillment process by the Engineering Department related to five bottleneck tasks. Eight improvement proposals are designed to address the root causes of each priority waste mode. The impact of implementing these improvement proposals on process time, failure risk, and process changes is analyzed and visualized in the future state value stream. Estimated results indicate that the implementation of these improvement proposals can reduce the working time of the Engineering staff by 167 minutes per day, equivalent to labor cost savings of Rp661,252 per day, a decrease in failure-related costs by Rp1,034,780 per day, as well as the elimination of one task, the adjustment of four tasks, and the addition of one task in the order fulfillment process by the Engineering Department. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT X is a job shop-based sheet metal fabrication company. In 2022, PT X's monthly on-time delivery targets were not met, prompting management to evaluate the order fulfillment process in each department. Historical data shows that the average overtime hours for the Engineering staff are relatively high compared to the established rules. This indicates that there may be non-value-added activities carried out by the Engineering Department in the order fulfillment process. This study proposes the use of a lean approach based on Product Development Value Stream Mapping (PD-VSM) to streamline the order fulfillment process by the Engineering Department, which shares similarities with product development and production control processes. PD-VSM is combined with Multi-Moment Analysis (MMA) to enhance the value-added aspects of the studied process. MMA is used to complement the limitations of using PD-VSM in a job shop environment. The research stages include process identification and mapping, current value stream mapping, and future value stream mapping. Based on the identification of waste in the current state value stream map, there are 12 priority waste modes in the order fulfillment process by the Engineering Department related to five bottleneck tasks. Eight improvement proposals are designed to address the root causes of each priority waste mode. The impact of implementing these improvement proposals on process time, failure risk, and process changes is analyzed and visualized in the future state value stream. Estimated results indicate that the implementation of these improvement proposals can reduce the working time of the Engineering staff by 167 minutes per day, equivalent to labor cost savings of Rp661,252 per day, a decrease in failure-related costs by Rp1,034,780 per day, as well as the elimination of one task, the adjustment of four tasks, and the addition of one task in the order fulfillment process by the Engineering Department.
format Final Project
author Huda Pratama, Aditya
spellingShingle Huda Pratama, Aditya
USULAN PERBAIKAN PROSES PEMENUHAN SALES ORDER OLEH DEPARTEMEN ENGINEERING PT X MENGGUNAKAN PRODUCT DEVELOPMENT VALUE STREAM MAPPING
author_facet Huda Pratama, Aditya
author_sort Huda Pratama, Aditya
title USULAN PERBAIKAN PROSES PEMENUHAN SALES ORDER OLEH DEPARTEMEN ENGINEERING PT X MENGGUNAKAN PRODUCT DEVELOPMENT VALUE STREAM MAPPING
title_short USULAN PERBAIKAN PROSES PEMENUHAN SALES ORDER OLEH DEPARTEMEN ENGINEERING PT X MENGGUNAKAN PRODUCT DEVELOPMENT VALUE STREAM MAPPING
title_full USULAN PERBAIKAN PROSES PEMENUHAN SALES ORDER OLEH DEPARTEMEN ENGINEERING PT X MENGGUNAKAN PRODUCT DEVELOPMENT VALUE STREAM MAPPING
title_fullStr USULAN PERBAIKAN PROSES PEMENUHAN SALES ORDER OLEH DEPARTEMEN ENGINEERING PT X MENGGUNAKAN PRODUCT DEVELOPMENT VALUE STREAM MAPPING
title_full_unstemmed USULAN PERBAIKAN PROSES PEMENUHAN SALES ORDER OLEH DEPARTEMEN ENGINEERING PT X MENGGUNAKAN PRODUCT DEVELOPMENT VALUE STREAM MAPPING
title_sort usulan perbaikan proses pemenuhan sales order oleh departemen engineering pt x menggunakan product development value stream mapping
url https://digilib.itb.ac.id/gdl/view/77523
_version_ 1822995379453427712