PENGATURAN LALU LINTAS UNTUK MENGURANGI PANJANG ANTREAN DAN TUNDAAN DI SIMPANG SAMSAT KOTA BANDUNG DENGAN SIMULASI KOMPUTER
Samsat Intersection in Bandung City is one of the most criticized intersections by Bandung citizens for having a long waiting time at the intersection. This intersection also causes long queues for more than one kilometer on one of the roads leading to the intersection. This research aimed to des...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/77764 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Samsat Intersection in Bandung City is one of the most criticized intersections by
Bandung citizens for having a long waiting time at the intersection. This
intersection also causes long queues for more than one kilometer on one of the
roads leading to the intersection. This research aimed to design a traffic
configuration in order to reduce intersection queue length and delay. In this
research, computer simulation is used as a method to find the solution to the
problem. PTV Vissim software is used to make traffic simulation model of this
intersection. Simulation is done for morning and afternoon rush hour on weekdays.
There are five general factors which are being used in this research, that is the
signal cycle time, signal phase, signal for left-turn, road divider for east approach,
and number of lanes for eastward road segment away from the intersection. There
are also two special factors which involve major road geometry modification, that
is U-turn system and an overpass. Experimental design is being used to arrange the
combination of levels among the five general factors that are being considered. All
general factors have two levels, that is existing condition and proposed condition.
For the duration factor, the two levels are long and short cycle time. For the phase
factor, the levels are east – west – south – north phase and east – west
(simultaneously with traffic from east to west) – south – north phase. For the left-
turn factor, the levels are go-through or ruled by signal. For the east approach
road divider factor, the levels are preserved and removed. For the lane of eastward
road factor, the levels are three lanes and four lanes. The result is a traffic
configuration which can shorten queue length by 84% in the morning and 70% in
the afternoon and shorten vehicle delay by 80% in the morning and 69% in the
afternoon.
|
---|