FLOOD RISK ANALYSIS DUE TO DAM BREAK AT BILI-BILI DAM, GOWA REGENCY, SOUTH SULAWESI BASED ON HEC-RAS MATHEMATICAL MODELING

This research is to analyze the risk of flooding due to the collapse of the Bili-bili Dam with the aim of predicting the impacts when it occurs, as well as providing recommendations to reduce the risk. The method used is modeling using HEC-HMS for routing dam collapse discharge and HEC-RAS to model...

Full description

Saved in:
Bibliographic Details
Main Author: Agusman
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/77975
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first