OPTIMIZATION MAP FOR EARTHQUAKE DISASTER EVACUATION INFRASTRUCTURE IN THE LEMBANG FAULT AREA BY CONSIDERING THE DANGER OF EARTHQUAKE IMPACTS (CASE STUDY OF LEMBANG SUBDISTRICT)
The Lembang Fault is one of the active faults in Indonesia, specifically in West Java Province, stretching approximately 29 km west-east in the north of the Bandung Basin. The location is next to dense residential areas and is a tourist attraction, namely Lembang. GPS data shows that there is a s...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/78451 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The Lembang Fault is one of the active faults in Indonesia, specifically in West Java Province,
stretching approximately 29 km west-east in the north of the Bandung Basin. The location is
next to dense residential areas and is a tourist attraction, namely Lembang. GPS data shows
that there is a small shift of around 0.3 to 1.4 cm/year on the Lembang fault. It is also said that
the Lembang fault could potentially produce shocks of magnitude 6.5 - 7. This certainly needs
to be a focus in response efforts to earthquake disasters. The aim of this research is to create a
disaster evacuation system in the form of an evacuation map, which consists of
recommendations for the distribution of evacuation places and evacuation routes using a safe
area approach to the dangers that can be caused by earthquakes and several other predetermined
criteria. The method used in determining evacuation routes is network analysis using isochrone
maps to determine the reachability of evacuation places from each point of origin, then a
routing process is carried out using network analysis to find the shortest route based on the
distance from the point of origin to the destination point. The results of the evacuation maps
that have been created will be compared with existing results, as input or recommendations for
better evacuation infrastructure results.
|
---|