PRELIMINARY DESIGN OF 7 TON/H CONTINUOUS MULTISTAGE FLUIDIZED BED DRYING SYSTEM COAL UPGRADING PILOT PLANT

Saved in:
Bibliographic Details
Main Author: Prawisudha, Pandji
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/78628
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia