#TITLE_ALTERNATIVE#

The height determination process from building objects can be done by overlaying data from aerial photogrammetry with Digital Terrain Model (DTM) data. <br /> <br /> <br /> <br /> <br /> There are few method of interpolation used to determine the position of build...

Full description

Saved in:
Bibliographic Details
Main Author: RAFSANJANI OP (NIM 15102009), FARRID
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/7882
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:7882
spelling id-itb.:78822017-10-09T10:51:09Z#TITLE_ALTERNATIVE# RAFSANJANI OP (NIM 15102009), FARRID Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/7882 The height determination process from building objects can be done by overlaying data from aerial photogrammetry with Digital Terrain Model (DTM) data. <br /> <br /> <br /> <br /> <br /> There are few method of interpolation used to determine the position of building coordinates in pixel coordinate system, which are Nearest Neighbor Interpolation method, Cubic Interpolation method, Bicubic Interpolation method. <br /> <br /> <br /> <br /> <br /> <br /> From analyzing the data processing process, it shown that for area with steep slope is better using the cubic interpolation method than nearest neighbor interpolation method because the result of data processing of cubic interpolation method is more precise than nearest neighbor interpolation method. This precision is needed for determine the building position accurately. But the calculation in the cubic interpolation method is more complicated. And for BiCubic Interpolation, the result of data processing is very extreme than both method above. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The height determination process from building objects can be done by overlaying data from aerial photogrammetry with Digital Terrain Model (DTM) data. <br /> <br /> <br /> <br /> <br /> There are few method of interpolation used to determine the position of building coordinates in pixel coordinate system, which are Nearest Neighbor Interpolation method, Cubic Interpolation method, Bicubic Interpolation method. <br /> <br /> <br /> <br /> <br /> <br /> From analyzing the data processing process, it shown that for area with steep slope is better using the cubic interpolation method than nearest neighbor interpolation method because the result of data processing of cubic interpolation method is more precise than nearest neighbor interpolation method. This precision is needed for determine the building position accurately. But the calculation in the cubic interpolation method is more complicated. And for BiCubic Interpolation, the result of data processing is very extreme than both method above. <br />
format Final Project
author RAFSANJANI OP (NIM 15102009), FARRID
spellingShingle RAFSANJANI OP (NIM 15102009), FARRID
#TITLE_ALTERNATIVE#
author_facet RAFSANJANI OP (NIM 15102009), FARRID
author_sort RAFSANJANI OP (NIM 15102009), FARRID
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/7882
_version_ 1820664269754073088