Batch Scheduling Model in Job Shop with Heterogeneous Group Machine to Minimizing Actual Flow Time

This Research develop batch scheduling model in Job Shop with heterogeneous group machine. A group of machine called heterogeneous if machines can produce same output, but at least one machine have different specification, like: operation, setup time or processing time. <br /> <br />...

Full description

Saved in:
Bibliographic Details
Main Author: RIZVIYATMAJA SARIAN (NIM 23405003), FEDO
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/7900
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:7900
spelling id-itb.:79002017-09-27T14:50:36ZBatch Scheduling Model in Job Shop with Heterogeneous Group Machine to Minimizing Actual Flow Time RIZVIYATMAJA SARIAN (NIM 23405003), FEDO Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/7900 This Research develop batch scheduling model in Job Shop with heterogeneous group machine. A group of machine called heterogeneous if machines can produce same output, but at least one machine have different specification, like: operation, setup time or processing time. <br /> <br /> <br /> <br /> The criteria for developed batch scheduling model is minimizing total actual flow time, which defined as the time the job spent in shop from the starting time of the processing until due date. Decision variables in this research are total batch, size batch, and batch sequence. There are 2 Algorithm that suggested getting the solution of model, Optimal Batch Scheduling Algorithm and Sub-Optimal Batch Scheduling Algorithm. <br /> <br /> <br /> <br /> The output of experiment indicates that model can resolve batch scheduling problem with heterogeneous group machine. From the output show that batch with same part not always scheduled in succession and the size of batch not always equal. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description This Research develop batch scheduling model in Job Shop with heterogeneous group machine. A group of machine called heterogeneous if machines can produce same output, but at least one machine have different specification, like: operation, setup time or processing time. <br /> <br /> <br /> <br /> The criteria for developed batch scheduling model is minimizing total actual flow time, which defined as the time the job spent in shop from the starting time of the processing until due date. Decision variables in this research are total batch, size batch, and batch sequence. There are 2 Algorithm that suggested getting the solution of model, Optimal Batch Scheduling Algorithm and Sub-Optimal Batch Scheduling Algorithm. <br /> <br /> <br /> <br /> The output of experiment indicates that model can resolve batch scheduling problem with heterogeneous group machine. From the output show that batch with same part not always scheduled in succession and the size of batch not always equal.
format Theses
author RIZVIYATMAJA SARIAN (NIM 23405003), FEDO
spellingShingle RIZVIYATMAJA SARIAN (NIM 23405003), FEDO
Batch Scheduling Model in Job Shop with Heterogeneous Group Machine to Minimizing Actual Flow Time
author_facet RIZVIYATMAJA SARIAN (NIM 23405003), FEDO
author_sort RIZVIYATMAJA SARIAN (NIM 23405003), FEDO
title Batch Scheduling Model in Job Shop with Heterogeneous Group Machine to Minimizing Actual Flow Time
title_short Batch Scheduling Model in Job Shop with Heterogeneous Group Machine to Minimizing Actual Flow Time
title_full Batch Scheduling Model in Job Shop with Heterogeneous Group Machine to Minimizing Actual Flow Time
title_fullStr Batch Scheduling Model in Job Shop with Heterogeneous Group Machine to Minimizing Actual Flow Time
title_full_unstemmed Batch Scheduling Model in Job Shop with Heterogeneous Group Machine to Minimizing Actual Flow Time
title_sort batch scheduling model in job shop with heterogeneous group machine to minimizing actual flow time
url https://digilib.itb.ac.id/gdl/view/7900
_version_ 1820664273879171072