EVALUATION OF MONOBORE DRILLING WELL ARCHITECTURE IN PT PERTAMINA HULU INDONESIA ZONA 9 PARTICULARLY IN STRUCTURE-X
In the context of the high-risk, high-investment oil and gas industry, operational efficiency plays a pivotal role in profitability, making Key Performance Indicators (KPI) a crucial focal point. In 2021, the oil production downturn in PEP TSS, particularly in the drilling sector, raised concerns...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/79040 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | In the context of the high-risk, high-investment oil and gas industry, operational
efficiency plays a pivotal role in profitability, making Key Performance Indicators
(KPI) a crucial focal point. In 2021, the oil production downturn in PEP TSS,
particularly in the drilling sector, raised concerns about the financial outlook. The
condition became tamed after merging with PHSS which created an opportunity to
knowledge transfer from one another. This actually prompts a critical examination
of the potential for implementing monobore well architecture, notably in StructureX.
Monobore design, renowned for its cost-effective approach to wellbore design, production,
and completion, emerges as a promising avenue for financial recovery for PEP TSS. The research stages encompass
a thorough literature review, analysis of primary and secondary data, quantitative assessments. Assumptions revolve
around the cost-effectiveness and performance improvements achievable through
monobore, supported by the hypothesis that it can outperform conventional well
architecture with high chance of success findings indicating a mere 14% probability
of NPV < 0 and an estimated $0.54 million USD increase in profitability compared
to conventional well architecture, suggesting significant potential for financial
gains in the industry. |
---|