A MANPOWER CAPACITY PLANNING PROCESS FOR ENGINESHOP USING MONTE CARLO SIMULATION
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/79045 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:79045 |
---|---|
spelling |
id-itb.:790452023-12-04T08:38:25ZA MANPOWER CAPACITY PLANNING PROCESS FOR ENGINESHOP USING MONTE CARLO SIMULATION Augusta Murbiantoro, Julian Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/79045 text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
|
format |
Final Project |
author |
Augusta Murbiantoro, Julian |
spellingShingle |
Augusta Murbiantoro, Julian A MANPOWER CAPACITY PLANNING PROCESS FOR ENGINESHOP USING MONTE CARLO SIMULATION |
author_facet |
Augusta Murbiantoro, Julian |
author_sort |
Augusta Murbiantoro, Julian |
title |
A MANPOWER CAPACITY PLANNING PROCESS FOR ENGINESHOP USING MONTE CARLO SIMULATION |
title_short |
A MANPOWER CAPACITY PLANNING PROCESS FOR ENGINESHOP USING MONTE CARLO SIMULATION |
title_full |
A MANPOWER CAPACITY PLANNING PROCESS FOR ENGINESHOP USING MONTE CARLO SIMULATION |
title_fullStr |
A MANPOWER CAPACITY PLANNING PROCESS FOR ENGINESHOP USING MONTE CARLO SIMULATION |
title_full_unstemmed |
A MANPOWER CAPACITY PLANNING PROCESS FOR ENGINESHOP USING MONTE CARLO SIMULATION |
title_sort |
manpower capacity planning process for engineshop using monte carlo simulation |
url |
https://digilib.itb.ac.id/gdl/view/79045 |
_version_ |
1822008761509740544 |