EVALUATION AND PROPOSE THE IMPROVEMENT OF ELECTRIC SUBMERSIBLE PUMP (ESP) OPERATION AT PT PEP USING SIX SIGMA DMAIC FRAMEWORK

The oil production target as a key performance indicator (KPI) of the ABC Field was not achieved in the last 5 years. It was because of the natural decline of the existing oil production cannot be maintained well. Decreased in production from the Electric Submersible Pump (ESP) wells was contribu...

Full description

Saved in:
Bibliographic Details
Main Author: Irfan
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/79081
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items