PROPOSED AGGREGATE SCHEDULING MODEL OF ENGINEER-TO-ORDER (ETO) PRODUCTION SYSTEM AT PT ARINDO CIPTA PERKASA
PT Arindo Cipta Perkasa (ACP) is a company engaged in manufacturing. PT ACP produces various kitchen appliance products made of stainless steel. PT ACP implements an engineer-to-order (ETO) production system, where customers can request certain specifications of the ordered product. In completing...
Saved in:
Main Author: | Ilham Falah, Ahmad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/79389 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Study of Amylum Potential as Natural Binders in Hot Briquetting Process in order to Convert Municipal Solid Waste into Solid Fuel
by: Ilham Utama, Arash -
PERFORMANCE ANALYSIS OF FINE TYPE STONE MASTIC ASPHALT USING STEEL SLAG AGGREGATE AS A SUBSTITUTE FOR COARSE AGGREGATE
by: Jomanta -
INTEGRATION MODEL OF BATCH SCHEDULING ON SINGLE BATCH PROCESSOR WITH MAINTENANCE SCHEDULING TO MINIMIZE SAVING, SETUP, MAINTENANCE, AND REWORK COSTS
by: Kurnia Ramadhani, Indah -
BACTH SCHEDULING MODEL FOR 2 DIMENSION NESTING PROCESS
by: Luqman, Muhammad -
STRUCTURAL AND CONNECTION ANALYSIS AND INSTALLATION METHOD OF TRUSS BRIDGE FOR DN 1000 WATER PIPE IN TANGERANG
by: Falah Aryasatya, Muhammad