COMPLEXITY IN PLANNING TRANSPORTATION MEGAPROJECT: A CASE STUDY OF JAKARTA INTEGRATED MODE OF TRANSPORTATION AND HIGH-SPEED RAILWAY OF JAKARTA- BANDUNG
The emergence of megaprojects has become a prevalent approach in urban infrastructure development across various countries. The primary aim of these megaprojects is to enhance the economy and elevate the quality of cities, enabling them to compete on a global scale with other urban centers worldw...
Saved in:
Main Author: | Widiastuti, Susanti |
---|---|
Format: | Dissertations |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/79399 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
REDESIGN OF KEBON JERUK AREA IN BANDUNG CITY WITH AN INTEGRATED TRANSPORTATION SYSTEM
by: Calvin, Andreas -
IDENTIFYING THE IMPACT OF PADALARANG HIGH-SPEED RAILWAY STATION ON ITS SURROUNDING LAND PRICES
by: Putri Saragih, Chrisantya -
THE IMPLEMENTATION OF GENDER SENSITIVE URBAN DESIGN IN PADALARANG STATION AND PADALARANG HIGH-SPEED RAILWAY STATION STREET CORRIDOR
by: Priyo Wicaksono, Aditya -
THE NEEDS ANALYSIS OF WASTE TRANSPORT VEHICLES BASED ON WASTE TRANSPORT RITATION AND SCENARIO
by: Silvianti, Fifian -
DESIGN PRINCIPLES OF WALKABLE URBAN FOOD CORRIDOR PLANNING ON SABANG STREET, CENTRAL JAKARTA
by: Renata Ulina Sinaga, Maria