DETERMINING INVENTORY POLICY OF RAW MATERIAL WITH ADAPTIVE KANBAN SYSTEM APPROACH AT PT TOYOTA ASTRA MOTOR USING MONTE CARLO SIMULATION
PT Toyota Astra Motor (TAM) is one of the companies that played a role in the development of the national automotive industry to achieve its target as a world automotive production base country. The company was engaged in the marketing of high-quality products and services for Toyota brand vehicl...
Saved in:
Main Author: | Widiyanti, Nelly |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/79597 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Simulating Multi Airport System Using Monte Carlo Simulation for The Delay Management System
by: Baig, Momal -
EVALUASI PERANGKAT LUNAK SIMULASI MONTE CARLO UNTUK PENENTUAN CADANGAN AWAL DAN ANALISIS RESIKO EKSPLORASI RESERVOIR X, Y, Z, CIREBON JAWA - BARAT
by: Marwanza, Irfan -
Conversion Gibbsite to Boehmite as Raw Material for ????-Alumina Support
by: Nurbanie, Aridhiena -
Conversion Gibbsite to Boehmite as Raw Material for ????-Alumina Support
by: Calvin -
SYNTHESIS OF NANO MAGNESIUM HYDROXIDE AS RAW MATERIAL FOR ANTACIDS
by: Rizqyna Dimyati, Kiki