STUDY OF LAND COVER CHANGESAGAINST FLOOD ON UPPER CITARUM WATERSHED(CASE STUDY OF UPPER CITARUM RIVER TO CIWIDEY RIVER)

One of the variables that can influence the characteristics of a watershed (DAS) and its hydrology is changes in land use. The population growth in the upstream Citarum Watershed, located in the City and Regency of Bandung, significantly affects changes in land cover in the upstream Citarum Water...

Full description

Saved in:
Bibliographic Details
Main Author: Musthopa Swara, Yuddi
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/79619
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:79619
spelling id-itb.:796192024-01-12T08:55:40ZSTUDY OF LAND COVER CHANGESAGAINST FLOOD ON UPPER CITARUM WATERSHED(CASE STUDY OF UPPER CITARUM RIVER TO CIWIDEY RIVER) Musthopa Swara, Yuddi Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Theses Land cover change, runoff, HEC-HMS, HEC-RAS. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/79619 One of the variables that can influence the characteristics of a watershed (DAS) and its hydrology is changes in land use. The population growth in the upstream Citarum Watershed, located in the City and Regency of Bandung, significantly affects changes in land cover in the upstream Citarum Watershed. Bandung, which serves as the capital of West Java Province and is also in the upstream area of the Citarum Watershed, is exposed to significant economic growth, attracting human behavior towards urbanization and leading to increased infrastructure needs such as residential and office areas. This increased demand is the cause of land use conversion from green open spaces to closed areas, such as residential or office areas. The change in land cover reduces the ability to absorb runoff, thereby increasing the water level or causing floods. Hydrological modeling using HEC-HMS will demonstrate the impact of curve number values, time lag, and infiltration values on discharge in the upstream Citarum Watershed in the year 2022, which will be calibrated with the discharge in the Nanjung Watershed. Discharge values, Manning's coefficient, and river geometry are the main parameters in flood modeling using HEC-RAS. The curve number values will be determined based on changes in land cover in the years 1990 and 2022. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Musthopa Swara, Yuddi
STUDY OF LAND COVER CHANGESAGAINST FLOOD ON UPPER CITARUM WATERSHED(CASE STUDY OF UPPER CITARUM RIVER TO CIWIDEY RIVER)
description One of the variables that can influence the characteristics of a watershed (DAS) and its hydrology is changes in land use. The population growth in the upstream Citarum Watershed, located in the City and Regency of Bandung, significantly affects changes in land cover in the upstream Citarum Watershed. Bandung, which serves as the capital of West Java Province and is also in the upstream area of the Citarum Watershed, is exposed to significant economic growth, attracting human behavior towards urbanization and leading to increased infrastructure needs such as residential and office areas. This increased demand is the cause of land use conversion from green open spaces to closed areas, such as residential or office areas. The change in land cover reduces the ability to absorb runoff, thereby increasing the water level or causing floods. Hydrological modeling using HEC-HMS will demonstrate the impact of curve number values, time lag, and infiltration values on discharge in the upstream Citarum Watershed in the year 2022, which will be calibrated with the discharge in the Nanjung Watershed. Discharge values, Manning's coefficient, and river geometry are the main parameters in flood modeling using HEC-RAS. The curve number values will be determined based on changes in land cover in the years 1990 and 2022.
format Theses
author Musthopa Swara, Yuddi
author_facet Musthopa Swara, Yuddi
author_sort Musthopa Swara, Yuddi
title STUDY OF LAND COVER CHANGESAGAINST FLOOD ON UPPER CITARUM WATERSHED(CASE STUDY OF UPPER CITARUM RIVER TO CIWIDEY RIVER)
title_short STUDY OF LAND COVER CHANGESAGAINST FLOOD ON UPPER CITARUM WATERSHED(CASE STUDY OF UPPER CITARUM RIVER TO CIWIDEY RIVER)
title_full STUDY OF LAND COVER CHANGESAGAINST FLOOD ON UPPER CITARUM WATERSHED(CASE STUDY OF UPPER CITARUM RIVER TO CIWIDEY RIVER)
title_fullStr STUDY OF LAND COVER CHANGESAGAINST FLOOD ON UPPER CITARUM WATERSHED(CASE STUDY OF UPPER CITARUM RIVER TO CIWIDEY RIVER)
title_full_unstemmed STUDY OF LAND COVER CHANGESAGAINST FLOOD ON UPPER CITARUM WATERSHED(CASE STUDY OF UPPER CITARUM RIVER TO CIWIDEY RIVER)
title_sort study of land cover changesagainst flood on upper citarum watershed(case study of upper citarum river to ciwidey river)
url https://digilib.itb.ac.id/gdl/view/79619
_version_ 1822008940491177984