#TITLE_ALTERNATIVE#
In one project, there are three major things that are should be considered, comprises quality, time, and cost. These three aspects are connected to each other so that the yield of the project is determined by them. In a public sale event (tender), the combination of the aspects will greatly influenc...
Saved in:
Main Author: | IWAN KURNIAWAN (NIM 29105301), GATOT |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/7966 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: Santoso (NIM 23191009), Gatot -
#TITLE_ALTERNATIVE#
by: RIDWAN (NIM 26989006), IWAN -
#TITLE_ALTERNATIVE#
by: SOGIWAN (NIM 15503003), IWAN -
#TITLE_ALTERNATIVE#
by: TEDJA (NIM 25091023), IWAN -
#TITLE_ALTERNATIVE#
by: Iwan Prasetyono (NIM : 20304002), Gabriel