JOB CATEGORY PRIORITIZATION AND SELECTION IN PT.MAI 88 USING ANALYTICAL HIERARCHY PROCESS (AHP)

PT. MAI 88, one of the government company divisions in the Pekanbaru City which operates in the fields of Public Works, Spatial Planning, Housing, Settlement Areas and Land. PT.MAI 88 experienced difficulties, namely that material resources were not allocated properly. This research investigat...

Full description

Saved in:
Bibliographic Details
Main Author: Alttha Ikhsan, Muhammad
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/79777
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:79777
spelling id-itb.:797772024-01-15T14:55:10ZJOB CATEGORY PRIORITIZATION AND SELECTION IN PT.MAI 88 USING ANALYTICAL HIERARCHY PROCESS (AHP) Alttha Ikhsan, Muhammad Indonesia Theses Road and Bridge Maintenance; Construction Management; Job Prioritization; MCDM; AHP INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/79777 PT. MAI 88, one of the government company divisions in the Pekanbaru City which operates in the fields of Public Works, Spatial Planning, Housing, Settlement Areas and Land. PT.MAI 88 experienced difficulties, namely that material resources were not allocated properly. This research investigates the root causes of this lack of precision in allocation, identifying a lack of clear guidelines and standard procedures for the distribution of construction materials. The communication gap between Project Management and stakeholders further exacerbates the problem, causing difficulties in estimating the materials required for each project. With the main aim of prioritizing the procurement of goods for road and bridge construction maintenance, this research focuses on one of the uses of Multicriteria Decision Making (MCDM), namely the Analytical Hierarchy Process (AHP) to determine the ranking of each construction goods procurement job. The AHP method itself has been discussed with stakeholders involved in the project. It has four categories and thirteen subcategories that have been determined and lead to 12 job alternatives. The results of the AHP show that the category with the highest weight starts from Urgency followed by Public Satisfaction, Quality, and Cost Management. Then for the Subcategory with the highest weight, namely Reports from local public, followed by Traffic Management, Long-term Durability and Reliability, Compliance with specifications and Standards, Labor Cost, Public Safety, Rent Construction Equipment, Resources Availability, Material Cost, Public Engagement and Communication, Stakeholder Expectations, Ease of Installation and Integration, and finally Subcontractor Cost. The alternatives with the highest weight are Procurement of Road Signs, Procurement of "Urugan Pilihan", Procurement of Base A Stones, Procurement of Base B Stones, Procurement of Several Construction Equipment, Procurement of Asphalt Concrete Binder Course, Procurement of Non-subsidized diesel fuel , Procurement of Dump Truck, Procurement of Binder Absorbent layer, Procurement of material for Culvert Channels and Boxes, Procurement of Construction Retaining Wall, Procurement of Cementation Work. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT. MAI 88, one of the government company divisions in the Pekanbaru City which operates in the fields of Public Works, Spatial Planning, Housing, Settlement Areas and Land. PT.MAI 88 experienced difficulties, namely that material resources were not allocated properly. This research investigates the root causes of this lack of precision in allocation, identifying a lack of clear guidelines and standard procedures for the distribution of construction materials. The communication gap between Project Management and stakeholders further exacerbates the problem, causing difficulties in estimating the materials required for each project. With the main aim of prioritizing the procurement of goods for road and bridge construction maintenance, this research focuses on one of the uses of Multicriteria Decision Making (MCDM), namely the Analytical Hierarchy Process (AHP) to determine the ranking of each construction goods procurement job. The AHP method itself has been discussed with stakeholders involved in the project. It has four categories and thirteen subcategories that have been determined and lead to 12 job alternatives. The results of the AHP show that the category with the highest weight starts from Urgency followed by Public Satisfaction, Quality, and Cost Management. Then for the Subcategory with the highest weight, namely Reports from local public, followed by Traffic Management, Long-term Durability and Reliability, Compliance with specifications and Standards, Labor Cost, Public Safety, Rent Construction Equipment, Resources Availability, Material Cost, Public Engagement and Communication, Stakeholder Expectations, Ease of Installation and Integration, and finally Subcontractor Cost. The alternatives with the highest weight are Procurement of Road Signs, Procurement of "Urugan Pilihan", Procurement of Base A Stones, Procurement of Base B Stones, Procurement of Several Construction Equipment, Procurement of Asphalt Concrete Binder Course, Procurement of Non-subsidized diesel fuel , Procurement of Dump Truck, Procurement of Binder Absorbent layer, Procurement of material for Culvert Channels and Boxes, Procurement of Construction Retaining Wall, Procurement of Cementation Work.
format Theses
author Alttha Ikhsan, Muhammad
spellingShingle Alttha Ikhsan, Muhammad
JOB CATEGORY PRIORITIZATION AND SELECTION IN PT.MAI 88 USING ANALYTICAL HIERARCHY PROCESS (AHP)
author_facet Alttha Ikhsan, Muhammad
author_sort Alttha Ikhsan, Muhammad
title JOB CATEGORY PRIORITIZATION AND SELECTION IN PT.MAI 88 USING ANALYTICAL HIERARCHY PROCESS (AHP)
title_short JOB CATEGORY PRIORITIZATION AND SELECTION IN PT.MAI 88 USING ANALYTICAL HIERARCHY PROCESS (AHP)
title_full JOB CATEGORY PRIORITIZATION AND SELECTION IN PT.MAI 88 USING ANALYTICAL HIERARCHY PROCESS (AHP)
title_fullStr JOB CATEGORY PRIORITIZATION AND SELECTION IN PT.MAI 88 USING ANALYTICAL HIERARCHY PROCESS (AHP)
title_full_unstemmed JOB CATEGORY PRIORITIZATION AND SELECTION IN PT.MAI 88 USING ANALYTICAL HIERARCHY PROCESS (AHP)
title_sort job category prioritization and selection in pt.mai 88 using analytical hierarchy process (ahp)
url https://digilib.itb.ac.id/gdl/view/79777
_version_ 1822281410068611072