BUSINESS STRATEGY FOR INDEPENDENT POWER PRODUCER (IPP) COMPANIES TO SUCCEED IN STATE OWN PROJECT TENDERCASE STUDY: POWER PURCHASE OF MINIHYDRO POWER PLANT (PLTM) WITH DISTRIBUTED QUOTA CAPACITY OF 15 MW ON JAMALI ELECTRICITY SYSTEM, INDONESIA
This Final Project delves into the strategic methods employed by Independent Power Producer (IPP) companies, with a particular focus on their participation in state-owned project tenders in Indonesia. The study centers around a case study of the Minihydro Power Plant (PLTM) within the JAMALI E...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/79893 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:79893 |
---|---|
spelling |
id-itb.:798932024-01-16T13:58:40ZBUSINESS STRATEGY FOR INDEPENDENT POWER PRODUCER (IPP) COMPANIES TO SUCCEED IN STATE OWN PROJECT TENDERCASE STUDY: POWER PURCHASE OF MINIHYDRO POWER PLANT (PLTM) WITH DISTRIBUTED QUOTA CAPACITY OF 15 MW ON JAMALI ELECTRICITY SYSTEM, INDONESIA Irfan Adriansyah, Muhamad Indonesia Theses Independent Power Producer, Minihydro Power Plant, Business Strategic Analysis, SWOT-TOWS, Diamonds Strategy/The Five Major Elements Strategy, Thematic Analysis, Regulatory Compliance, Sustainability INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/79893 This Final Project delves into the strategic methods employed by Independent Power Producer (IPP) companies, with a particular focus on their participation in state-owned project tenders in Indonesia. The study centers around a case study of the Minihydro Power Plant (PLTM) within the JAMALI Electricity System, examining the dynamics and challenges faced by IPPs in the tender process. The research employs a variety of analytical tools, including SWOT-TOWS analysis, diamond strategy/five element strategy, and thematic analysis, to decode the complexities and develop strategic solutions. Key findings indicate that IPPs need to align their strategies with evolving government policies, market demands, and environmental factors. The study underscores the importance of regulatory compliance, risk management, and sustainable business practices. It provides significant insights into the strategic necessities for IPPs to be successful in bidding for state-owned project tenders, emphasizing the need for adaptability, ethical practices, and strategic collaboration. The final project presents a comprehensive roadmap for IPPs to boost their competitive edge and achieve success in Indonesia's dynamic renewable energy sector. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
This Final Project delves into the strategic methods employed by Independent
Power Producer (IPP) companies, with a particular focus on their participation in
state-owned project tenders in Indonesia. The study centers around a case study of
the Minihydro Power Plant (PLTM) within the JAMALI Electricity System,
examining the dynamics and challenges faced by IPPs in the tender process. The
research employs a variety of analytical tools, including SWOT-TOWS analysis,
diamond strategy/five element strategy, and thematic analysis, to decode the
complexities and develop strategic solutions.
Key findings indicate that IPPs need to align their strategies with evolving
government policies, market demands, and environmental factors. The study
underscores the importance of regulatory compliance, risk management, and
sustainable business practices. It provides significant insights into the strategic
necessities for IPPs to be successful in bidding for state-owned project tenders,
emphasizing the need for adaptability, ethical practices, and strategic collaboration.
The final project presents a comprehensive roadmap for IPPs to boost their
competitive edge and achieve success in Indonesia's dynamic renewable energy
sector. |
format |
Theses |
author |
Irfan Adriansyah, Muhamad |
spellingShingle |
Irfan Adriansyah, Muhamad BUSINESS STRATEGY FOR INDEPENDENT POWER PRODUCER (IPP) COMPANIES TO SUCCEED IN STATE OWN PROJECT TENDERCASE STUDY: POWER PURCHASE OF MINIHYDRO POWER PLANT (PLTM) WITH DISTRIBUTED QUOTA CAPACITY OF 15 MW ON JAMALI ELECTRICITY SYSTEM, INDONESIA |
author_facet |
Irfan Adriansyah, Muhamad |
author_sort |
Irfan Adriansyah, Muhamad |
title |
BUSINESS STRATEGY FOR INDEPENDENT POWER PRODUCER (IPP) COMPANIES TO SUCCEED IN STATE OWN PROJECT TENDERCASE STUDY: POWER PURCHASE OF MINIHYDRO POWER PLANT (PLTM) WITH DISTRIBUTED QUOTA CAPACITY OF 15 MW ON JAMALI ELECTRICITY SYSTEM, INDONESIA |
title_short |
BUSINESS STRATEGY FOR INDEPENDENT POWER PRODUCER (IPP) COMPANIES TO SUCCEED IN STATE OWN PROJECT TENDERCASE STUDY: POWER PURCHASE OF MINIHYDRO POWER PLANT (PLTM) WITH DISTRIBUTED QUOTA CAPACITY OF 15 MW ON JAMALI ELECTRICITY SYSTEM, INDONESIA |
title_full |
BUSINESS STRATEGY FOR INDEPENDENT POWER PRODUCER (IPP) COMPANIES TO SUCCEED IN STATE OWN PROJECT TENDERCASE STUDY: POWER PURCHASE OF MINIHYDRO POWER PLANT (PLTM) WITH DISTRIBUTED QUOTA CAPACITY OF 15 MW ON JAMALI ELECTRICITY SYSTEM, INDONESIA |
title_fullStr |
BUSINESS STRATEGY FOR INDEPENDENT POWER PRODUCER (IPP) COMPANIES TO SUCCEED IN STATE OWN PROJECT TENDERCASE STUDY: POWER PURCHASE OF MINIHYDRO POWER PLANT (PLTM) WITH DISTRIBUTED QUOTA CAPACITY OF 15 MW ON JAMALI ELECTRICITY SYSTEM, INDONESIA |
title_full_unstemmed |
BUSINESS STRATEGY FOR INDEPENDENT POWER PRODUCER (IPP) COMPANIES TO SUCCEED IN STATE OWN PROJECT TENDERCASE STUDY: POWER PURCHASE OF MINIHYDRO POWER PLANT (PLTM) WITH DISTRIBUTED QUOTA CAPACITY OF 15 MW ON JAMALI ELECTRICITY SYSTEM, INDONESIA |
title_sort |
business strategy for independent power producer (ipp) companies to succeed in state own project tendercase study: power purchase of minihydro power plant (pltm) with distributed quota capacity of 15 mw on jamali electricity system, indonesia |
url |
https://digilib.itb.ac.id/gdl/view/79893 |
_version_ |
1822996584740159488 |