PERANCANGAN TATA LETAK PADA GUDANG BAHAN PENGEMAS DI PT XYZ

PT XYZ is a manufacturing company that operates in the fast-moving consumer goods (FMCG) industry, producing various types of products. One of the flagship products is toothpaste. One of the frequent problems that happen there is the suboptimal utilization of the packaging material warehouse due...

Full description

Saved in:
Bibliographic Details
Main Author: Rezon, George
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/79934
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:PT XYZ is a manufacturing company that operates in the fast-moving consumer goods (FMCG) industry, producing various types of products. One of the flagship products is toothpaste. One of the frequent problems that happen there is the suboptimal utilization of the packaging material warehouse due to the lack of storage media and item classification. This is characterized by pallets placed on the floor, resulting in frequent pallet congestion and repeated item movements. The research aims to analyze and propose improvements to the layout of the packaging material warehouse at PT XYZ. The problem-solving process begins with classifying items according to ABC and FSN analyses, which are used to group items based on their significant impact on company revenue and the frequency of incoming and outgoing packaging materials. The items analyzed in both analyses are combined into eight classes: AF, BF, AS, BS, CS, AN, BN, and CN. By calculating the consumption rate for each packaging material, the required number of racks is determined based on the available area in the warehouse. Two layout design proposals are then developed, each capable of accommodating 244 and 248 pallets, respectively. The material handling costs for the observed design is Rp 6.553.831, the first proposed design is Rp 5.426.600, and the second proposed design is Rp 5.397.626. The validation is done using FlexSim simulation for both proposed designs, resulting in the material procurement costs. The first proposed design incurs costs of Rp 5.004.931, and the second proposed design incurs costs of Rp 4.878.998.