ANALYSIS OF THE INVESTMENT FACTORS FOR THE REPLACEMENT OF COAL FIRED POWER PLANT USING FUZZY AHP

Indonesia aims to reach net zero emissions by 2060 during the 2021 United Nations Climate Change Conference in Glasglow, UK. This study investigated factors that might affect the decision-making process in the investment of coal fired power plant replacement: Political, Economic, Social, Techn...

Full description

Saved in:
Bibliographic Details
Main Author: Furukawa, Takahide
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/79951
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:79951
spelling id-itb.:799512024-01-17T08:41:00ZANALYSIS OF THE INVESTMENT FACTORS FOR THE REPLACEMENT OF COAL FIRED POWER PLANT USING FUZZY AHP Furukawa, Takahide Indonesia Theses Investment decision-making, net zero emission, coal fired power plant, fuzzy analytical hierarchy process, PESTEL INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/79951 Indonesia aims to reach net zero emissions by 2060 during the 2021 United Nations Climate Change Conference in Glasglow, UK. This study investigated factors that might affect the decision-making process in the investment of coal fired power plant replacement: Political, Economic, Social, Technological, Environmental, and Legal (PESTEL) factors. Fuzzy analytical hierarchy process (AHP) method was utilized and 10 Indonesian and Japanese experts with prior experience in the investment of coal fired power plant replacement projects in Indonesia were participated in this study for a month. Fuzzy AHP method was utilized as it considers the uncertainty in decision-making, such as human thoughts and perceptions. Economic and legal feasibility were found to be the most affluent factors in the decisionmaking process to mitigate from coal fired power plant. Furthermore, gas fired power plant was found to be the optimal alternative to mitigate from coal fired power plant. Referred to levelized cost of electricity (LCOE), it was revealed that geothermal power plant was also a possible alternative, however, private companies might face difficulties in accessing geothermal power source as it is managed by the Indonesian government. This study provides insight and alternatives to consider to replace current dependency on coal fired power plant and to reach full potential in low-carbonization, decarbonization, and net zero emissions in Indonesia. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Indonesia aims to reach net zero emissions by 2060 during the 2021 United Nations Climate Change Conference in Glasglow, UK. This study investigated factors that might affect the decision-making process in the investment of coal fired power plant replacement: Political, Economic, Social, Technological, Environmental, and Legal (PESTEL) factors. Fuzzy analytical hierarchy process (AHP) method was utilized and 10 Indonesian and Japanese experts with prior experience in the investment of coal fired power plant replacement projects in Indonesia were participated in this study for a month. Fuzzy AHP method was utilized as it considers the uncertainty in decision-making, such as human thoughts and perceptions. Economic and legal feasibility were found to be the most affluent factors in the decisionmaking process to mitigate from coal fired power plant. Furthermore, gas fired power plant was found to be the optimal alternative to mitigate from coal fired power plant. Referred to levelized cost of electricity (LCOE), it was revealed that geothermal power plant was also a possible alternative, however, private companies might face difficulties in accessing geothermal power source as it is managed by the Indonesian government. This study provides insight and alternatives to consider to replace current dependency on coal fired power plant and to reach full potential in low-carbonization, decarbonization, and net zero emissions in Indonesia.
format Theses
author Furukawa, Takahide
spellingShingle Furukawa, Takahide
ANALYSIS OF THE INVESTMENT FACTORS FOR THE REPLACEMENT OF COAL FIRED POWER PLANT USING FUZZY AHP
author_facet Furukawa, Takahide
author_sort Furukawa, Takahide
title ANALYSIS OF THE INVESTMENT FACTORS FOR THE REPLACEMENT OF COAL FIRED POWER PLANT USING FUZZY AHP
title_short ANALYSIS OF THE INVESTMENT FACTORS FOR THE REPLACEMENT OF COAL FIRED POWER PLANT USING FUZZY AHP
title_full ANALYSIS OF THE INVESTMENT FACTORS FOR THE REPLACEMENT OF COAL FIRED POWER PLANT USING FUZZY AHP
title_fullStr ANALYSIS OF THE INVESTMENT FACTORS FOR THE REPLACEMENT OF COAL FIRED POWER PLANT USING FUZZY AHP
title_full_unstemmed ANALYSIS OF THE INVESTMENT FACTORS FOR THE REPLACEMENT OF COAL FIRED POWER PLANT USING FUZZY AHP
title_sort analysis of the investment factors for the replacement of coal fired power plant using fuzzy ahp
url https://digilib.itb.ac.id/gdl/view/79951
_version_ 1822996608485163008