DESIGN OF NEW RENEWABLE ENERGY POWER PLANT TO IMPROVE RELIABILITY IN THE BAU-BAU ELECTRICITY SYSTEM

The Indonesian region, especially Southeast Sulawesi, has significant potential for renewable energy, especially biomass and solar. Biomass, the fuel of a biomass power plant (BPP) derived from the conversion of biological material, has a high potential in Southeny Sulawesia, especially from resi...

Full description

Saved in:
Bibliographic Details
Main Author: Yustigama, Elman
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/80165
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:80165
spelling id-itb.:801652024-01-19T08:44:00ZDESIGN OF NEW RENEWABLE ENERGY POWER PLANT TO IMPROVE RELIABILITY IN THE BAU-BAU ELECTRICITY SYSTEM Yustigama, Elman Indonesia Theses Reliability, LOLP, LOLE, Biomass, PV. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/80165 The Indonesian region, especially Southeast Sulawesi, has significant potential for renewable energy, especially biomass and solar. Biomass, the fuel of a biomass power plant (BPP) derived from the conversion of biological material, has a high potential in Southeny Sulawesia, especially from residues such as oil palm and coconut. Solar power plants (PV) convert solar energy into electricity. As a renewable source of energy, biomass and solar energy offer alternatives to power generation, potentially increasing power supply, especially for Baubau isolated power systems. The study uses reliability recursive methods to calculate Loss of Load Probability (LOLP) and Loss Of Load Expectation. (LOLE). By 2023, the government is planning to build a Baubau 3 x 9.78 MW PLTMG to improve reliability. In the Bau-Bau power system, consisting of 14 power plants with a peak load of 40.25 MW by 2022, LOLE recorded 1.02 days/year. By adding PLTBm with a capacity of 1.34 MW, LOLE decreased to 0.71 days/ year, or 30.39%. PLTS is needed to increase LOLP at peak loads, which are still high above standard. Based on the Homer Pro simulation, the optimum value for PLTS was 9.373 kW, the battery was 26.972 kWh, and the inverter was 13.906 kW. On the PLTS system, Net Present Cost (NPC) was $166 million and Levelized Cost of Energy (LCOE) $2.63 per kWh. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The Indonesian region, especially Southeast Sulawesi, has significant potential for renewable energy, especially biomass and solar. Biomass, the fuel of a biomass power plant (BPP) derived from the conversion of biological material, has a high potential in Southeny Sulawesia, especially from residues such as oil palm and coconut. Solar power plants (PV) convert solar energy into electricity. As a renewable source of energy, biomass and solar energy offer alternatives to power generation, potentially increasing power supply, especially for Baubau isolated power systems. The study uses reliability recursive methods to calculate Loss of Load Probability (LOLP) and Loss Of Load Expectation. (LOLE). By 2023, the government is planning to build a Baubau 3 x 9.78 MW PLTMG to improve reliability. In the Bau-Bau power system, consisting of 14 power plants with a peak load of 40.25 MW by 2022, LOLE recorded 1.02 days/year. By adding PLTBm with a capacity of 1.34 MW, LOLE decreased to 0.71 days/ year, or 30.39%. PLTS is needed to increase LOLP at peak loads, which are still high above standard. Based on the Homer Pro simulation, the optimum value for PLTS was 9.373 kW, the battery was 26.972 kWh, and the inverter was 13.906 kW. On the PLTS system, Net Present Cost (NPC) was $166 million and Levelized Cost of Energy (LCOE) $2.63 per kWh.
format Theses
author Yustigama, Elman
spellingShingle Yustigama, Elman
DESIGN OF NEW RENEWABLE ENERGY POWER PLANT TO IMPROVE RELIABILITY IN THE BAU-BAU ELECTRICITY SYSTEM
author_facet Yustigama, Elman
author_sort Yustigama, Elman
title DESIGN OF NEW RENEWABLE ENERGY POWER PLANT TO IMPROVE RELIABILITY IN THE BAU-BAU ELECTRICITY SYSTEM
title_short DESIGN OF NEW RENEWABLE ENERGY POWER PLANT TO IMPROVE RELIABILITY IN THE BAU-BAU ELECTRICITY SYSTEM
title_full DESIGN OF NEW RENEWABLE ENERGY POWER PLANT TO IMPROVE RELIABILITY IN THE BAU-BAU ELECTRICITY SYSTEM
title_fullStr DESIGN OF NEW RENEWABLE ENERGY POWER PLANT TO IMPROVE RELIABILITY IN THE BAU-BAU ELECTRICITY SYSTEM
title_full_unstemmed DESIGN OF NEW RENEWABLE ENERGY POWER PLANT TO IMPROVE RELIABILITY IN THE BAU-BAU ELECTRICITY SYSTEM
title_sort design of new renewable energy power plant to improve reliability in the bau-bau electricity system
url https://digilib.itb.ac.id/gdl/view/80165
_version_ 1822996703125438464