DESIGN OF INTEGRATED WASTE TREATMENT PLANT (TPST) IN BATUJAJAR DISTRICT, WEST BANDUNG REGENCY
The waste management currently implemented in West Bandung Regency involves the collection-transport-disposal method, with waste disposal services limited to only 9 out of the total 16 districts in West Bandung Regency. Among the 9 districts receiving services, only urban areas are covered, while in...
Saved in:
Main Author: | Dui Oktavianto, Alif |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/80268 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF INTEGRATED WASTE TREATMENT PLANT (TPST) IN REGOL DISTRICT, BANDUNG CITY
by: Husni Nurulloh, Rizal -
THE DESIGN OF INTEGRATED SOLID WASTE MANAGEMENT SITE (TPST) IN BANGUNTAPAN DISTRICT, BANTUL REGENCY
by: Hasbi Ash Shiddiq, Rifki -
Design of Integrated Solid Waste Management Plant (TPST) in Talangagung TPA, Malang Regency
by: Karim, Abdul -
Design of Integrated Solid Waste Management Plant (TPST) in Talangagung TPA, Malang Regency
by: Karim, Abdul -
DESIGN OF INTEGRATED SOLID WASTE TREATMENT SITE (TPST) IN TPPAS CIKOLOTOK, PURWAKARTA REGENCY
by: NATASIA DUMAWI SIDABUTAR NIM: 15714015, LASTRI