ROAD REPAIR PROGRAM WITH INTERNATIONAL ROUGHNESS INDEX (IRI) VALUE USING MARKOV CHAIN PREDICTION METHOD AND ITS EFFECT ON COSTS VEHICLE OPERATION (CASE STUDY : GREATER BANDUNG NATIONAL ROADS)

Saved in:
Bibliographic Details
Main Author: Afriyanti Adnan, Urfri
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/80480
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:80480
spelling id-itb.:804802024-01-23T13:27:18ZROAD REPAIR PROGRAM WITH INTERNATIONAL ROUGHNESS INDEX (IRI) VALUE USING MARKOV CHAIN PREDICTION METHOD AND ITS EFFECT ON COSTS VEHICLE OPERATION (CASE STUDY : GREATER BANDUNG NATIONAL ROADS) Afriyanti Adnan, Urfri Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/80480 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description
format Theses
author Afriyanti Adnan, Urfri
spellingShingle Afriyanti Adnan, Urfri
ROAD REPAIR PROGRAM WITH INTERNATIONAL ROUGHNESS INDEX (IRI) VALUE USING MARKOV CHAIN PREDICTION METHOD AND ITS EFFECT ON COSTS VEHICLE OPERATION (CASE STUDY : GREATER BANDUNG NATIONAL ROADS)
author_facet Afriyanti Adnan, Urfri
author_sort Afriyanti Adnan, Urfri
title ROAD REPAIR PROGRAM WITH INTERNATIONAL ROUGHNESS INDEX (IRI) VALUE USING MARKOV CHAIN PREDICTION METHOD AND ITS EFFECT ON COSTS VEHICLE OPERATION (CASE STUDY : GREATER BANDUNG NATIONAL ROADS)
title_short ROAD REPAIR PROGRAM WITH INTERNATIONAL ROUGHNESS INDEX (IRI) VALUE USING MARKOV CHAIN PREDICTION METHOD AND ITS EFFECT ON COSTS VEHICLE OPERATION (CASE STUDY : GREATER BANDUNG NATIONAL ROADS)
title_full ROAD REPAIR PROGRAM WITH INTERNATIONAL ROUGHNESS INDEX (IRI) VALUE USING MARKOV CHAIN PREDICTION METHOD AND ITS EFFECT ON COSTS VEHICLE OPERATION (CASE STUDY : GREATER BANDUNG NATIONAL ROADS)
title_fullStr ROAD REPAIR PROGRAM WITH INTERNATIONAL ROUGHNESS INDEX (IRI) VALUE USING MARKOV CHAIN PREDICTION METHOD AND ITS EFFECT ON COSTS VEHICLE OPERATION (CASE STUDY : GREATER BANDUNG NATIONAL ROADS)
title_full_unstemmed ROAD REPAIR PROGRAM WITH INTERNATIONAL ROUGHNESS INDEX (IRI) VALUE USING MARKOV CHAIN PREDICTION METHOD AND ITS EFFECT ON COSTS VEHICLE OPERATION (CASE STUDY : GREATER BANDUNG NATIONAL ROADS)
title_sort road repair program with international roughness index (iri) value using markov chain prediction method and its effect on costs vehicle operation (case study : greater bandung national roads)
url https://digilib.itb.ac.id/gdl/view/80480
_version_ 1822009199063728128