MAPPING OF THE POTENTIAL OFFSHORE AND SHORE WIND POWER PLANT IN INDONESIA BASED ON LEVELISED COST OF ELECTRICITY

In accordance with government regulations laid down in PP No.79 Tahun 2014 on the National Energy Policy, new and renewable energy targets in Indonesia by 2025 are at least 23% and 31% by 2050. To meet the targets of new energy sources in Indonesia, studies on the mapping of Wind Power Plant (WPP) a...

Full description

Saved in:
Bibliographic Details
Main Author: Pebnaldy
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/80600
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items