MAPPING OF THE POTENTIAL OFFSHORE AND SHORE WIND POWER PLANT IN INDONESIA BASED ON LEVELISED COST OF ELECTRICITY
In accordance with government regulations laid down in PP No.79 Tahun 2014 on the National Energy Policy, new and renewable energy targets in Indonesia by 2025 are at least 23% and 31% by 2050. To meet the targets of new energy sources in Indonesia, studies on the mapping of Wind Power Plant (WPP) a...
Saved in:
Main Author: | Pebnaldy |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/80600 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Levelised Cost of Storage (LCOS) for solar-PV-powered cooling in the tropics
by: Luerssen, C, et al.
Published: (2019) -
Levelised cost of PV integration for distribution networks
by: Gandhi, Oktoviano, et al.
Published: (2022) -
Global sensitivity and uncertainty analysis of the levelised cost of storage (LCOS) for solar-PV-powered cooling
by: Luerssen, Christoph, et al.
Published: (2021) -
Constructing the map of offshore wind energy potential along the coast of Vietnam
by: Vũ, Đình Quang
Published: (2020) -
An Estimation of the Potential Offshore Wind Power in Japan by Satellite Data
by: FUJII, Tomoki
Published: (1999)