DECISION ANALYSIS TO FIND BEST SOLUTION OF OPERATION AND MAINTENANCE MANAGEMENT SYSTEM IN CENTRAL PROCESSING PLANT (CPP) GUNDIH USING THE SMART METHOD AT PT. PERTAMINA EP

Central Processing Plant (CPP) Gundih is a gas field owned by PT. Pertamina EP Cepu Field area which is located in Blora Regency, Central Java. The gas produced by the CPP Gundih is channelled to the Tambak Lorok Gas and Steam Power Plant (PLTGU) with a capacity of 1,469MW in the Semarang City area,...

Full description

Saved in:
Bibliographic Details
Main Author: Zainal Abidin, A.
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/80682
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia