COST OPTIMIZATION AND RISK MANAGEMENT PROGRAM FOR THE FUEL SUPPLY NETWORK OF DELTA MAHAKAM MARINE OPERATION

PT Pertamina Hulu Mahakam (PHM) is an oil and gas company currently operating in Mahakam PSC. In order to support production activities, the company utilizes marine fleets in the Delta Mahakam area. PHM procures a service contract mechanism from the vessel owner and separately liaises with another c...

Full description

Saved in:
Bibliographic Details
Main Author: Nuur Afiif, Herdiar
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/80685
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:80685
spelling id-itb.:806852024-02-27T08:07:23ZCOST OPTIMIZATION AND RISK MANAGEMENT PROGRAM FOR THE FUEL SUPPLY NETWORK OF DELTA MAHAKAM MARINE OPERATION Nuur Afiif, Herdiar Manajemen umum Indonesia Theses cost optimization, fuel supply network, risk management, AHP, FMEA INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/80685 PT Pertamina Hulu Mahakam (PHM) is an oil and gas company currently operating in Mahakam PSC. In order to support production activities, the company utilizes marine fleets in the Delta Mahakam area. PHM procures a service contract mechanism from the vessel owner and separately liaises with another contractor to conduct fuel provision for those marine fleets. The stakeholders highly encourage cost optimization programs to ensure business profitability. Operational fuel expenses constitute a significant component of the annual budget and have become the highlight of the cost reduction initiative. The risk management program is evaluated to ensure streamlined implementation with minimal disturbance impact. Four main criteria (operational expenses, service reliability, value creation, health, safety, and environment) exist to establish the best supply network for the company. Revamping the fuel supply network with four alternatives (direct shipment, distribution center, hybrid network, vendor-managed inventory) is studied to evaluate the company's associated risks and potential benefits. The analytical hierarchy process (AHP) decision-making process is applied to determine the best fuel supply network in the Mahakam area. The hybrid network shows the highest rating at 33.7% at a 0.5% consistency ratio based on the evaluation from subject matter experts. Supply chain risk management uses Failure Mode Effect Analysis (FMEA) to avoid disruption in company operations. The hybrid network has the lowest total risk priority number compared with other alternatives, with 212 points. The implementation plan for the hybrid network is provided to support the realization of the project and obtain cost savings for the company. The program highlights the top three risk issues: personnel injury, oil spill accidents, stock losses, and discrepancies. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Nuur Afiif, Herdiar
COST OPTIMIZATION AND RISK MANAGEMENT PROGRAM FOR THE FUEL SUPPLY NETWORK OF DELTA MAHAKAM MARINE OPERATION
description PT Pertamina Hulu Mahakam (PHM) is an oil and gas company currently operating in Mahakam PSC. In order to support production activities, the company utilizes marine fleets in the Delta Mahakam area. PHM procures a service contract mechanism from the vessel owner and separately liaises with another contractor to conduct fuel provision for those marine fleets. The stakeholders highly encourage cost optimization programs to ensure business profitability. Operational fuel expenses constitute a significant component of the annual budget and have become the highlight of the cost reduction initiative. The risk management program is evaluated to ensure streamlined implementation with minimal disturbance impact. Four main criteria (operational expenses, service reliability, value creation, health, safety, and environment) exist to establish the best supply network for the company. Revamping the fuel supply network with four alternatives (direct shipment, distribution center, hybrid network, vendor-managed inventory) is studied to evaluate the company's associated risks and potential benefits. The analytical hierarchy process (AHP) decision-making process is applied to determine the best fuel supply network in the Mahakam area. The hybrid network shows the highest rating at 33.7% at a 0.5% consistency ratio based on the evaluation from subject matter experts. Supply chain risk management uses Failure Mode Effect Analysis (FMEA) to avoid disruption in company operations. The hybrid network has the lowest total risk priority number compared with other alternatives, with 212 points. The implementation plan for the hybrid network is provided to support the realization of the project and obtain cost savings for the company. The program highlights the top three risk issues: personnel injury, oil spill accidents, stock losses, and discrepancies.
format Theses
author Nuur Afiif, Herdiar
author_facet Nuur Afiif, Herdiar
author_sort Nuur Afiif, Herdiar
title COST OPTIMIZATION AND RISK MANAGEMENT PROGRAM FOR THE FUEL SUPPLY NETWORK OF DELTA MAHAKAM MARINE OPERATION
title_short COST OPTIMIZATION AND RISK MANAGEMENT PROGRAM FOR THE FUEL SUPPLY NETWORK OF DELTA MAHAKAM MARINE OPERATION
title_full COST OPTIMIZATION AND RISK MANAGEMENT PROGRAM FOR THE FUEL SUPPLY NETWORK OF DELTA MAHAKAM MARINE OPERATION
title_fullStr COST OPTIMIZATION AND RISK MANAGEMENT PROGRAM FOR THE FUEL SUPPLY NETWORK OF DELTA MAHAKAM MARINE OPERATION
title_full_unstemmed COST OPTIMIZATION AND RISK MANAGEMENT PROGRAM FOR THE FUEL SUPPLY NETWORK OF DELTA MAHAKAM MARINE OPERATION
title_sort cost optimization and risk management program for the fuel supply network of delta mahakam marine operation
url https://digilib.itb.ac.id/gdl/view/80685
_version_ 1822996901642895360