CONTRACTOR EVALUATION AND SELECTION WITH ANALYTIC HIERARCHY PROCESS METHOD FOR PROGRAMMABLE LOGIC CONTROLLER PROGRAMMING SERVICES AT PT FREEPORT INDONESIA
Crusher conveyor systems in the underground mine serve as the backbone of the company’s copper mining operations in Papua – Indonesia, which necessitate PLC programming to enhance automation capabilities in mining operations. Contract Department of SCM Division is assigned an imperative task of cont...
Saved in:
Main Author: | Yudhita, Nila |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/80727 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STRATEGY TO IMPROVE SERVICE CONTRACTOR EMPLOYEE TECHNICAL CAPABILITY AT OPERATION MAINTENANCE DIVISION IN PT FREEPORT INDONESIA
by: M.N Waturandang, Yullia -
THE SELECTION OF AN INTERNET SERVICE PROVIDER FOR AN EDUCATION TECHNOLOGY COMPANY BY USING THE ANALYTICAL HIERARCHY PROCESS (AHP)
by: Sadria, Farihah -
ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT THE BEST SERVICE CONTRACT MODEL IN MNS LABORATORY TO SUPPORT CEOR PROJECT
by: Widiyanto, Adi -
PROPOSED IMPROVEMENT OF CONTRACTOR SELECTION FOR MAINTENANCE OF REACTOR EFFLUENT AIR COOLER USING VALUE-FOCUSED THINKING AND ANALYTIC HIERARCHY PROCESS AT PT KILANG PERTAMINA INTERNASIONAL RU V BALIKPAPAN
by: Dahri, Kurniawan -
IMPLEMENTATION OF ANALYTICAL HIERARCHY PROCESS IN SELECTING CAPITAL EXPENDITURE (CAPEX) PROGRAM IN PT. ANGKASA PURA II (PERSERO)
by: Akbar, Giri