INVESTMENT PROJECT ANALYSIS OF CONSTRUCTION MAINTENANCE PROJECT (CASE STUDY FOR PT.ABC)

This research evaluates the investment analysis of a construction maintenance project for PT. ABC in Indonesia. The research systematically evaluates both external and internal business environments through Porter's Five Forces and VRIO framework, respectively. It scrutinizes the competitive dy...

Full description

Saved in:
Bibliographic Details
Main Author: Ghoffaar Noorwandi, Abdul
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/80751
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:80751
spelling id-itb.:807512024-03-07T07:55:35ZINVESTMENT PROJECT ANALYSIS OF CONSTRUCTION MAINTENANCE PROJECT (CASE STUDY FOR PT.ABC) Ghoffaar Noorwandi, Abdul Manajemen umum Indonesia Theses Construction Maintenance, Investment Analysis, NPV, IRR, PBP, PI, Sensitivity Analysis. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/80751 This research evaluates the investment analysis of a construction maintenance project for PT. ABC in Indonesia. The research systematically evaluates both external and internal business environments through Porter's Five Forces and VRIO framework, respectively. It scrutinizes the competitive dynamics, regulatory challenges, and internal capabilities of PT. ABC. Additionally, the study investment analysis use indicators like Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PBP), and Profitability Index (PI), to assess the contract's feasibility. Significant attention is paid to sensitivity analysis and Monte Carlo simulation to estimate the impact of various risk factors on the project’s financial outcomes. The findings suggest that the contract is economically feasible under current assumptions. The research concludes by recommending strategies for risk mitigation and suggests methods for improving future project evaluations in similar contexts. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Ghoffaar Noorwandi, Abdul
INVESTMENT PROJECT ANALYSIS OF CONSTRUCTION MAINTENANCE PROJECT (CASE STUDY FOR PT.ABC)
description This research evaluates the investment analysis of a construction maintenance project for PT. ABC in Indonesia. The research systematically evaluates both external and internal business environments through Porter's Five Forces and VRIO framework, respectively. It scrutinizes the competitive dynamics, regulatory challenges, and internal capabilities of PT. ABC. Additionally, the study investment analysis use indicators like Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PBP), and Profitability Index (PI), to assess the contract's feasibility. Significant attention is paid to sensitivity analysis and Monte Carlo simulation to estimate the impact of various risk factors on the project’s financial outcomes. The findings suggest that the contract is economically feasible under current assumptions. The research concludes by recommending strategies for risk mitigation and suggests methods for improving future project evaluations in similar contexts.
format Theses
author Ghoffaar Noorwandi, Abdul
author_facet Ghoffaar Noorwandi, Abdul
author_sort Ghoffaar Noorwandi, Abdul
title INVESTMENT PROJECT ANALYSIS OF CONSTRUCTION MAINTENANCE PROJECT (CASE STUDY FOR PT.ABC)
title_short INVESTMENT PROJECT ANALYSIS OF CONSTRUCTION MAINTENANCE PROJECT (CASE STUDY FOR PT.ABC)
title_full INVESTMENT PROJECT ANALYSIS OF CONSTRUCTION MAINTENANCE PROJECT (CASE STUDY FOR PT.ABC)
title_fullStr INVESTMENT PROJECT ANALYSIS OF CONSTRUCTION MAINTENANCE PROJECT (CASE STUDY FOR PT.ABC)
title_full_unstemmed INVESTMENT PROJECT ANALYSIS OF CONSTRUCTION MAINTENANCE PROJECT (CASE STUDY FOR PT.ABC)
title_sort investment project analysis of construction maintenance project (case study for pt.abc)
url https://digilib.itb.ac.id/gdl/view/80751
_version_ 1822996935162724352