TECHNO ECONOMIC FEASIBILITY OF GEOTHERMAL POWER PLANT IN INDONESIA USING RETSCREEN CONSIDERING CARBON CREDIT MECHANISM TO ACHIEVE INDONESIAâS NDC 2060
Indonesia’s geothermal reserves made the country has abundant geothermal energy potential but its utilization is still minimum due to insufficient investor participation. In the PLN Power Supply Generation (RUPTL PLN) indicates that there are a potential of 330 MW geothermal power plant in Gunung...
Saved in:
Main Author: | Chrisantia Husein, Maura |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/80763 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TECHNO ECONOMIC FEASIBILITY STUDY OF SOLAR PHOTOVOLTAIC POWER PLANT USING RETSCREEN TO ACHIEVE INDONESIA ENERGY TRANSITION
by: Timotiyas Paradongan, Hendry -
ACHIEVING 2060 NET ZERO EMISSION TARGET: BUSINESS STRATEGY FOR INDONESIAâS OIL AND GAS COMPANY THROUGH CCS (CARBON CAPTURE AND STORAGE) IMPLEMENTATION WITH SCENARIO PLANNING
by: Uli Alfiana, Marizkia -
ECHNO ECONOMIC STUDY OF FLOATING SOLAR PHOTOVOLTAIC PROJECT IN INDONESIA USING RETSCREEN
by: Rifansyah, Muhammad -
EFFECTIVE AND EFFICIENT CGS STRATEGY TO MITIGATE NDC UNPLANNED TOTAL SHUTDOWN: A CASE IN PT. CAPITAL PETROLEUM INDONESIA
by: Susanto Pasaribu, Ade -
COMPANY FAIR VALUATION CONSIDERING ESG FACTOR (CASE STUDY : PT PERTAMINA GEOTHERMAL ENERGY, TBK)
by: Chandra M. M. Y., Qiva