REFUELLING FLOWTIME IMPROVEMENT AT FUEL TERMINAL X PT EPN

The evaluation of PT EPN's fuel distribution process at Terminal X is crucial in achieving the operational target of 14 hours per day. However, during the assessment period, the target was only met 56% of the time, indicating a significant operational gap of 44%. Blocking in truck entry to the...

Full description

Saved in:
Bibliographic Details
Main Author: Isroq, Syaderli
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/80771
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:80771
spelling id-itb.:807712024-03-08T09:58:36ZREFUELLING FLOWTIME IMPROVEMENT AT FUEL TERMINAL X PT EPN Isroq, Syaderli Manajemen umum Indonesia Theses Fuel Distribution, Driver Queue flow Design, Daily Operational Time, Flow Time. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/80771 The evaluation of PT EPN's fuel distribution process at Terminal X is crucial in achieving the operational target of 14 hours per day. However, during the assessment period, the target was only met 56% of the time, indicating a significant operational gap of 44%. Blocking in truck entry to the refueling stage were caused by long queues, driver negligence, administrative processes, and technical glitches at the terminal. These issues impacted the efficiency of the refueling process and prevented the operational target from being achieved. Utilizing the SIOD application at Terminal X, this study interprets data to determine the flowtime of the refueling process. Root cause analysis using the 5 Why method identified delays in refueling trucks, with capacities of 16 KL and 24 KL, exceeding contract targets by 20%. Reducing flowtime could result in PT PN, the stakeholder, saving IDR 574 million annually in overtime expenses and reducing worker fatigue and incidents during late-night work. This research provides practical implications that can improve PT EPN's operational performance. The recommendations presented aim to improve the number of man-hours worked, efficiency, and safety. The proposed strategy involves identifying operational constraints and defects that affect operational performance, as well as finding effective solutions to allocate daily operational targets in line with contractual obligations between PT EPN and PT PN. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Isroq, Syaderli
REFUELLING FLOWTIME IMPROVEMENT AT FUEL TERMINAL X PT EPN
description The evaluation of PT EPN's fuel distribution process at Terminal X is crucial in achieving the operational target of 14 hours per day. However, during the assessment period, the target was only met 56% of the time, indicating a significant operational gap of 44%. Blocking in truck entry to the refueling stage were caused by long queues, driver negligence, administrative processes, and technical glitches at the terminal. These issues impacted the efficiency of the refueling process and prevented the operational target from being achieved. Utilizing the SIOD application at Terminal X, this study interprets data to determine the flowtime of the refueling process. Root cause analysis using the 5 Why method identified delays in refueling trucks, with capacities of 16 KL and 24 KL, exceeding contract targets by 20%. Reducing flowtime could result in PT PN, the stakeholder, saving IDR 574 million annually in overtime expenses and reducing worker fatigue and incidents during late-night work. This research provides practical implications that can improve PT EPN's operational performance. The recommendations presented aim to improve the number of man-hours worked, efficiency, and safety. The proposed strategy involves identifying operational constraints and defects that affect operational performance, as well as finding effective solutions to allocate daily operational targets in line with contractual obligations between PT EPN and PT PN.
format Theses
author Isroq, Syaderli
author_facet Isroq, Syaderli
author_sort Isroq, Syaderli
title REFUELLING FLOWTIME IMPROVEMENT AT FUEL TERMINAL X PT EPN
title_short REFUELLING FLOWTIME IMPROVEMENT AT FUEL TERMINAL X PT EPN
title_full REFUELLING FLOWTIME IMPROVEMENT AT FUEL TERMINAL X PT EPN
title_fullStr REFUELLING FLOWTIME IMPROVEMENT AT FUEL TERMINAL X PT EPN
title_full_unstemmed REFUELLING FLOWTIME IMPROVEMENT AT FUEL TERMINAL X PT EPN
title_sort refuelling flowtime improvement at fuel terminal x pt epn
url https://digilib.itb.ac.id/gdl/view/80771
_version_ 1822996947155288064