USULAN PERBAIKAN SISTEM PENGELOLAAN SAMPAH UNTUK MENINGKATKAN PERFORMANSI PRODUKSI RUMAH PEMULIHAN MATERI WASTE4CHANGE DENGAN DISCRETE EVENT SIMULATION (DES)

Waste4Change is a waste management startup company that focuses on reducing the amount of waste that ends up in the landfill (final processing site). Waste management activities are carried out in RPM (material recovery house) which consists of various types of waste processing. Currently, there...

Full description

Saved in:
Bibliographic Details
Main Author: Hasna Prasanti, Syahira
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/80795
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Waste4Change is a waste management startup company that focuses on reducing the amount of waste that ends up in the landfill (final processing site). Waste management activities are carried out in RPM (material recovery house) which consists of various types of waste processing. Currently, there are problems regarding the accumulation of waste materials that have not been processed so this research aims to design alternative solutions so that the amount of waste materials that can be processed into final products increases. In this research, the computer simulation method for discrete events with FlexSim Simulation Software is used to find the best alternative solution that can improve production performance at RPM. Based on the simulation results, one bottleneck workstation was found, namely the sorting table in the commercial area.. There are four factors used in this study, there are the number of additional sorting table units, sorting table process time, number of centric machine units and gibrik machines. The experimental design is used to combine levels and factors as a proposed scenario, then the proposed results from the experimental design are compared with the proposed results from the Optimization feature provided by FlexSim. The results of the comparison were then further analysed by looking at the amount of output, work-in- process (WIP), and utilization. With this further analysis, the best proposed scenario as an alternative solution was found, which consisted of adding seven additional sorting table units, increasing the sorting table process time, and not adding centric machine and gibrik machine. The implementation of this alternative solution can reduce the accumulation of waste material that previously occurred while increasing the production performance of RPM by 27,62% from the existing condition.