PERFORMANCE-BASED EVALUATION OF THE BAKAUHENI â TERBANGGI BESAR TOLL ROAD BRIDGE BASED ON SNI 1725:2016 AND SNI 2833:2016 (CASE STUDY : IC TERBANGGI BESAR BRIDGE)
There are many structural systems that can be chosen in building a bridge. One of them is the prestressed concrete bridge system. An example of the use of a bridge with prestressed concrete construction is the IC Terbanggi Besar Bridge STA. 139+925, which is a bridge located on the Bakauheni – Te...
Saved in:
Main Author: | Dendi Nosya, Akhmad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/81028 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF PADANG PANJANG SINGLE-TRACK RAILWAY IGIRDER PRESTRESSED CONCRETE BRIDGE SPANS 40 METERS
by: Indah Mukharromah, Nur -
DESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ̉̉ BATU TABAL CORRIDOR
by: ZIKRA AULIA, AFDAL -
STUDY OF TRAFFIC SAFETY ON URBAN TOLL ROADS NETWORK DUE TO THE INFLUENCE OF GEOMETRIC (STUDY CASE : JABODETABEK TOLL ROADS NETWORK)
by: Budhi Darmo, Pangestu -
NATIONAL ROADS MANAGEMENT USING MARKOV CHAIN MODEL (CASE STUDY: NATIONAL ROADS IN BANTEN PROVINCE )
by: NUGROHO, ANTON -
EVALUATION OF THE STRUCTURAL CONDITION FOR FLEXIBLE PAVEMENT USING AASHTO 1993 METHOD AND EVERCALC PROGRAM Case Study : Pantura Road Sewo Lohbener Segment.
by: Marshal, Amando