ESTIMATED CHANGES IN LAND AND PROPERTY PRICESIN TOD AREAS AROUND THE DEVELOPMENT PLAN OF BANDUNG LRT STATION
The development of urban rail transportation systems and Transit-Oriented Development (TOD) have the potential for value creation due to increasement of urban accessibility and various types of activites agglomeration that affect changes in land and property prices around the transportation nodes...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/81031 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The development of urban rail transportation systems and Transit-Oriented
Development (TOD) have the potential for value creation due to increasement of
urban accessibility and various types of activites agglomeration that affect changes
in land and property prices around the transportation nodes area. The increase in
land and property values can be beneficial for the community and government,
especially in developing LVC (Land Value Capture) scheme which is currently
being developed in Indonesia as an alternative scheme in funding transportation
infrastructure. Bandung City currently has a plan to build Bandung LRT (Light Rail
Transit), but it has not been realized yet due to financial constraints. Research on
the impact of urban rail transportation system and TOD development has been
widely conducted, but there was not much research related to estimating changes
in land and property prices that can occur in the future, especially in Bandung LRT
development project. The identification of estimated changes in land and property
prices was carried out using pilot case studies, namely the Jakarta MRT (Mass
Rapid Transit) and Jabodebek LRT, which are similar urban rail transportation
systems that already exist in Indonesia. This research was conducted by identifying
several factors that can affect land and property prices using content analysis of
previous studies related to hedonic pricing models in similar case studies which
were then used in identifying differences model in land and property prices using
Propensity Score Matching (PSM) analysis, as well as identifying price models and
estimating changes in land and property prices using multiple linear regression
analysis. Based on PSM analysis results, areas in Jakarta City that already have
an urban rail transportation system have an average land price per sqm and
property prices per sqm which are significantly higher than areas in Bandung City
that have similar characteristics. Based on multiple linear regression analysis
results using the robust model, there are a total of 11 (eleven) variables that can
affect land price per sqm and overall property prices on built-up and vacant land,
namely distance to the nearest station or TOD, land use, land area, building area,
distance to the nearest toll gate, distance to the CBD, distance to the nearest
hospital, distance to the nearest elementary school, distance to the nearest senior
high school, distance to the nearest amusement or commercial area, and distanceiv
to the nearest recreation area/tourist attraction/sports center. The existence of
urban rail transportation systems and TOD themselves significantly has a positive
influence on the increase in land prices per sqm and overall property prices on both
built-up and vacant land. Based on the regression prediction calculation from the
obtained hedonic pricing models, there are 94% increase in the average land price
per sqm and 65% increase in the average property price of built-up land, as well
as 169% increase in the average land price per sqm and 51% increase in the
average property prices of vacant land in the TOD areas around the development
plan of Bandung LRT Station which can occur up to a span of 4 (four) years after
the Bandung LRT officially operates and can be considered in the determination of
LVC scheme in the future. |
---|