#TITLE_ALTERNATIVE#

Abstract: <br /> <br /> <br /> <br /> <br /> <br /> <br /> Padalarang-Purwakarta line is important line, because this line to connect with Bandung and Jakarta. Especially for the Jakarta-Bandung line, which was used by the Argogede trains, Parahiyan...

Full description

Saved in:
Bibliographic Details
Main Author: Wibowo (NIM : 280 97 019), Heriyanto
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/8108
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:8108
spelling id-itb.:81082017-09-27T15:29:56Z#TITLE_ALTERNATIVE# Wibowo (NIM : 280 97 019), Heriyanto Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/8108 Abstract: <br /> <br /> <br /> <br /> <br /> <br /> <br /> Padalarang-Purwakarta line is important line, because this line to connect with Bandung and Jakarta. Especially for the Jakarta-Bandung line, which was used by the Argogede trains, Parahiyangan trains, and container trains. Finally this line that of higher line-capacity, with the increasing train traffic frequency. The best solution with improvement double track, but difficult because there are some big rivers one of Cisomang River, so that must be construct new bridge. Perumka not yet experience to construction the long span bridge (more than 60 meter), by which to need more evaluation and .study for many typical long span bridge. To selection the bridge will be recommended with the model of Analytic Hierarchy Process (AHP). The hierarchy structures will be result consist of four level, first level is the target for selection of optimal bridge, second level is actor, third level is criteria, and lowest level is alternative. The data will be collecting from questionnaire of the person how is experience in construction of railway bridges project. Six person will be eligible from lecturer, retired Indonesian Railway employees who is in consultant or contractor still now. The calculate data with Expert Choice program, specially program for solution of Analytic Hierarchy Process problems. The result of first priority is concrete bridge with score 0,395; second priority is arched bridge with score 0,213; third priority is truss bridge with score 0,199; fourth priority is cable stayed bridge. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Abstract: <br /> <br /> <br /> <br /> <br /> <br /> <br /> Padalarang-Purwakarta line is important line, because this line to connect with Bandung and Jakarta. Especially for the Jakarta-Bandung line, which was used by the Argogede trains, Parahiyangan trains, and container trains. Finally this line that of higher line-capacity, with the increasing train traffic frequency. The best solution with improvement double track, but difficult because there are some big rivers one of Cisomang River, so that must be construct new bridge. Perumka not yet experience to construction the long span bridge (more than 60 meter), by which to need more evaluation and .study for many typical long span bridge. To selection the bridge will be recommended with the model of Analytic Hierarchy Process (AHP). The hierarchy structures will be result consist of four level, first level is the target for selection of optimal bridge, second level is actor, third level is criteria, and lowest level is alternative. The data will be collecting from questionnaire of the person how is experience in construction of railway bridges project. Six person will be eligible from lecturer, retired Indonesian Railway employees who is in consultant or contractor still now. The calculate data with Expert Choice program, specially program for solution of Analytic Hierarchy Process problems. The result of first priority is concrete bridge with score 0,395; second priority is arched bridge with score 0,213; third priority is truss bridge with score 0,199; fourth priority is cable stayed bridge. <br />
format Theses
author Wibowo (NIM : 280 97 019), Heriyanto
spellingShingle Wibowo (NIM : 280 97 019), Heriyanto
#TITLE_ALTERNATIVE#
author_facet Wibowo (NIM : 280 97 019), Heriyanto
author_sort Wibowo (NIM : 280 97 019), Heriyanto
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/8108
_version_ 1820664329666560000