REDESIGN BEDOG WATER TREATMENT PLAN (WTP) TIRTAMARTA REGIONAL WATER COMPANY OF YOGYAKARTA
Process of processing and distributing clean water in Yogyakarta is carried out to meet the needs and demands of the people of the city of Yogyakarta and its surroundings which are carried out by the Regional Drinking Water Company Tirtamarta. PDAM Tirtamarta has 9 Clean Water Treatment Installat...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/81257 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:81257 |
---|---|
spelling |
id-itb.:812572024-06-06T10:43:53ZREDESIGN BEDOG WATER TREATMENT PLAN (WTP) TIRTAMARTA REGIONAL WATER COMPANY OF YOGYAKARTA Fathur Wijayanto, Falah Indonesia Final Project Bedog Water Treatment Plan, Tirtamarta Regional Public Drinking Water Company, Raw Water, Ground Water, Surface Water, Aeration, Sedimentation, Filtration, Reservoir, Slow Sand Filter, Bar Screen, Debit. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/81257 Process of processing and distributing clean water in Yogyakarta is carried out to meet the needs and demands of the people of the city of Yogyakarta and its surroundings which are carried out by the Regional Drinking Water Company Tirtamarta. PDAM Tirtamarta has 9 Clean Water Treatment Installations. Among the 9 IPAs, one of them is Bedog IPA. The Bedog IPA raw water supply itself comes from Kartamantul wells and SPAM. IPA Bedog has 15 wells. The process of processing the raw water supply is currently through the process of aeration, sedimentation, filtration, and is stored in reservoirs and then distributed to the public. The condition of raw water quality in Bedog WTP itself contains quite high fe and mn, but the treated water shows fe and mn levels that have met the quality standards. IPA Bedog serves 6 sub-districts in the City of Yogyakarta with a total served population of 107,808 people. For now, the Bedog IPA has sufficient water supply to serve the 6 sub-districts. But for the next 20 years, it is necessary to increase the debit by increasing the supply of raw water from surface water because the raw water discharge through groundwater decreases every year, while the amount of water demand increases. Therefore, it is necessary to build a new processing unit because it takes raw water from the Bedog River. based on the alternative that has been selected, namely the addition of intake building, housing pump, bar screen units, and slow sand filter. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Process of processing and distributing clean water in Yogyakarta is carried out to meet the needs
and demands of the people of the city of Yogyakarta and its surroundings which are carried out by
the Regional Drinking Water Company Tirtamarta. PDAM Tirtamarta has 9 Clean Water
Treatment Installations. Among the 9 IPAs, one of them is Bedog IPA. The Bedog IPA raw water
supply itself comes from Kartamantul wells and SPAM. IPA Bedog has 15 wells. The process of
processing the raw water supply is currently through the process of aeration, sedimentation,
filtration, and is stored in reservoirs and then distributed to the public. The condition of raw water
quality in Bedog WTP itself contains quite high fe and mn, but the treated water shows fe and mn
levels that have met the quality standards. IPA Bedog serves 6 sub-districts in the City of
Yogyakarta with a total served population of 107,808 people. For now, the Bedog IPA has
sufficient water supply to serve the 6 sub-districts. But for the next 20 years, it is necessary to
increase the debit by increasing the supply of raw water from surface water because the raw water
discharge through groundwater decreases every year, while the amount of water demand increases.
Therefore, it is necessary to build a new processing unit because it takes raw water from the Bedog
River. based on the alternative that has been selected, namely the addition of intake building,
housing pump, bar screen units, and slow sand filter. |
format |
Final Project |
author |
Fathur Wijayanto, Falah |
spellingShingle |
Fathur Wijayanto, Falah REDESIGN BEDOG WATER TREATMENT PLAN (WTP) TIRTAMARTA REGIONAL WATER COMPANY OF YOGYAKARTA |
author_facet |
Fathur Wijayanto, Falah |
author_sort |
Fathur Wijayanto, Falah |
title |
REDESIGN BEDOG WATER TREATMENT PLAN (WTP) TIRTAMARTA REGIONAL WATER COMPANY OF YOGYAKARTA |
title_short |
REDESIGN BEDOG WATER TREATMENT PLAN (WTP) TIRTAMARTA REGIONAL WATER COMPANY OF YOGYAKARTA |
title_full |
REDESIGN BEDOG WATER TREATMENT PLAN (WTP) TIRTAMARTA REGIONAL WATER COMPANY OF YOGYAKARTA |
title_fullStr |
REDESIGN BEDOG WATER TREATMENT PLAN (WTP) TIRTAMARTA REGIONAL WATER COMPANY OF YOGYAKARTA |
title_full_unstemmed |
REDESIGN BEDOG WATER TREATMENT PLAN (WTP) TIRTAMARTA REGIONAL WATER COMPANY OF YOGYAKARTA |
title_sort |
redesign bedog water treatment plan (wtp) tirtamarta regional water company of yogyakarta |
url |
https://digilib.itb.ac.id/gdl/view/81257 |
_version_ |
1822281857294663680 |