READINESS STUDY OF GOVERNANCE LOCAL GOVERNMENT ON THE IMPLEMENTATION OF PPP AVAILABILITY PAYMENT (AP)
In the construction sector, civil buildings are utilized for various purposes, including serving as supportive infrastructure to harness natural resources. One crucial natural resource is coal, which is currently highly demanded as a source of electricity. The redesign of the coal storage shed in...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/81516 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:81516 |
---|---|
spelling |
id-itb.:815162024-06-28T13:30:04ZREADINESS STUDY OF GOVERNANCE LOCAL GOVERNMENT ON THE IMPLEMENTATION OF PPP AVAILABILITY PAYMENT (AP) Henro Indonesia Theses coal shed, arch truss frame, long-span steel structure, special steel truss moment frame, ordinary moment-resisting frame. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/81516 In the construction sector, civil buildings are utilized for various purposes, including serving as supportive infrastructure to harness natural resources. One crucial natural resource is coal, which is currently highly demanded as a source of electricity. The redesign of the coal storage shed in the Jawa 9 & 10 Coal Fired Steam Power Plant Project is significant to provide an alternative reference for structural design to support coal utilization. In the design process, preliminary design determines the system, configuration, and material of the structure based on load analysis and reference standards. Following the preliminary design, software calculations are verified using manual calculations to check failure modes of structural elements and connections based on applicable standards. The coal shed is planned to use an arch steel truss frame system for its efficiency in long-span structures (96 m). As a seismic force-resisting system, a special truss moment-resisting frame system and ordinary moment-resisting frame system are employed. The design is based on capacity design per reference standards. Steel structure calculations are conducted using software and manual calculations to verify failure modes based on applicable standards. The design output includes dimensions, types, and specifications of structural elements and connections. The overall final design results are represented through comprehensive technical drawing visualizations. The hope is that this work can serve as a reference for future alternatives related to relevant aspects discussed herein. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
In the construction sector, civil buildings are utilized for various purposes,
including serving as supportive infrastructure to harness natural resources. One
crucial natural resource is coal, which is currently highly demanded as a source of
electricity. The redesign of the coal storage shed in the Jawa 9 & 10 Coal Fired
Steam Power Plant Project is significant to provide an alternative reference for
structural design to support coal utilization.
In the design process, preliminary design determines the system, configuration, and
material of the structure based on load analysis and reference standards. Following
the preliminary design, software calculations are verified using manual calculations
to check failure modes of structural elements and connections based on applicable
standards. The coal shed is planned to use an arch steel truss frame system for its
efficiency in long-span structures (96 m). As a seismic force-resisting system, a
special truss moment-resisting frame system and ordinary moment-resisting frame
system are employed.
The design is based on capacity design per reference standards. Steel structure
calculations are conducted using software and manual calculations to verify failure
modes based on applicable standards. The design output includes dimensions,
types, and specifications of structural elements and connections. The overall final
design results are represented through comprehensive technical drawing
visualizations. The hope is that this work can serve as a reference for future
alternatives related to relevant aspects discussed herein.
|
format |
Theses |
author |
Henro |
spellingShingle |
Henro READINESS STUDY OF GOVERNANCE LOCAL GOVERNMENT ON THE IMPLEMENTATION OF PPP AVAILABILITY PAYMENT (AP) |
author_facet |
Henro |
author_sort |
Henro |
title |
READINESS STUDY OF GOVERNANCE LOCAL GOVERNMENT ON THE IMPLEMENTATION OF PPP AVAILABILITY PAYMENT (AP) |
title_short |
READINESS STUDY OF GOVERNANCE LOCAL GOVERNMENT ON THE IMPLEMENTATION OF PPP AVAILABILITY PAYMENT (AP) |
title_full |
READINESS STUDY OF GOVERNANCE LOCAL GOVERNMENT ON THE IMPLEMENTATION OF PPP AVAILABILITY PAYMENT (AP) |
title_fullStr |
READINESS STUDY OF GOVERNANCE LOCAL GOVERNMENT ON THE IMPLEMENTATION OF PPP AVAILABILITY PAYMENT (AP) |
title_full_unstemmed |
READINESS STUDY OF GOVERNANCE LOCAL GOVERNMENT ON THE IMPLEMENTATION OF PPP AVAILABILITY PAYMENT (AP) |
title_sort |
readiness study of governance local government on the implementation of ppp availability payment (ap) |
url |
https://digilib.itb.ac.id/gdl/view/81516 |
_version_ |
1822997348171644928 |