MAPPING OF THE LUMUT BALAI GEOTHERMAL POWER PLANT (GPP)
The Geothermal Power Plant (PLTP) owned by PT X PLTP was built with less than ideal topographic and geological conditions, namely by clearing mountainous land This makes it vulnerable to shifts in the ground surface. In addition, various processes at PLTP cause vibrations which can increase the risk...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/81797 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!